Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Uttar Pradesh Primary Bump Stop For Fiat Bogies To Drg. No. 1227081 Alt. 04r2 To Be Read With t.s 17.531.100.03 With Amndt. No. 1, T.s 17.617.100.02, Mdts 148 Rev. 01, mdts 122 Rev.03. .#* Primary Bump Stop For Fiat Bogies To Drg. No. 1227081 Alt. 04r2 To Be Read With
22 Apr 2026
Rajasthan Eoi For Inviting Detailed Worable Action Plan For Supply Fmcg Products At 5000 Annapurna Bhandar
Estimated Cost :1
09 Apr 2026
Maharashtra Primary Vertical Damper For Vb/train .#* Primary Vertical Damper For Vb/train Set To M/s Itt Koni Drg No. Off 16728 Rev-b Or Zf drg No401300004470----. Item To Be As Per M/s Ec Engineering Damper Specification No Mt18b r2 00146605 Or Latest Version. [ War
22 Apr 2026
Maharashtra Secondary Vertical Damper For Vb/train .#* Secondary Vertical Damper For Vb/train Set To M/s Itt Koni Drg No. Off 16730 Rev-a O r Zf Drg No401300004471----. Item To Be As Per M/s Ec Engineering Damper Specification No M t18br2 00146605 Or Latest [ Warrant
22 Apr 2026
Maharashtra Horizontal Damper For Vb Train .#* Horizontal Damper For Vb Train Set To M/s Itt Koni Drg No.off 16729, Rev-b Or Zf Drg N o401300004472----.item To As Per M/s Ec Engineering Specification No. Mt18br2 001466-05 Or L atest [ Warranty Period: 36 Months After
22 Apr 2026
Maharashtra Yaw Damper For Vb/train .#* Yaw Damper For Vb/train Set To M/s Itt Koni Drg No. Off 16809 Rev-b Or Zf Drg No 401 300004473 Item To Be As Per M/s Ec Engineering Damper Specification No Mt18br2 001466-05 or Latest [ Warranty Period: 36 Months After The Date
22 Apr 2026
Uttar Pradesh Smps Based Integrated Power Supply (ips) .#* Supply Installation Testing & Commissioning Of Smps Based Integrated Power Su pply(ips) System, As Per Rdso Spec.no. Rdso/spn/165/2023 Version 4.0 Amendment 1.0 Date Effective 20 06 2024 Along With Surge Protec
21 Apr 2026
Uttar Pradesh 145kv, 800 Amp Hv Bushing For 132/25 Kv Transformer .#* 145 Kv, 800 Amp Hv Bushing For 132/25 Kv Transformer As Per Specification No. Eti/psi/118 10/93) With A & C Slip No. 1 To 10. Drawing Attached In Pdf. [ Warranty Period: 30 Months After The Date of D
21 Apr 2026
Delhi Puller For Exp/compressor Valve Guide.for Locomotives As Per Drawing number Mt05gm0096. .#* Puller For Exp/compressor Valve Guide.for Locomotives As Per Drawing Number Mt 05gm0096. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
20 Apr 2026
Uttar Pradesh Supply ,installation & Testing Of Waterless Urinals .#* Supply,installation And Testing Of Waterless Urinal In Wap-7 Type Electric Locomotive As Per R dso Spec. No. Rdso/2023/el/frs/0034(rev-2) Or Latest And Continuing To Rdso Ms No.rdso/2025/el/ms/ 0508,
21 Apr 2026