Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply And Installation Of 20 Kw Off Grid Solar Power Plant At 05 Different Common Health Centers, Jhanjharpur, State- Bihar U.p
Estimated Cost :7700000 INR
09 Sep 2026
Uttar Pradesh Supply Installation And Commissioning Of 1 Nos. 5 Kva On Grid Solar Power Plant In Legislative Area Pratapgarh U.p.
Estimated Cost :263100 INR
04 Sep 2026
Uttar Pradesh Installation Work Of 05 Kilowatt Off-grid Solar Power Plant In 21 Secondary Schools Of Chandauli District Under Csr Scheme U.p
Estimated Cost :9030000 INR
09 Sep 2026
Uttar Pradesh Supply Of 2 Kw Capacity Rooftof Solar Plant Construction Of Tube Well And Supply Of 1 Hp Capacity Submersible Pump Set And Supply Of Solar Street Light Etc Works For Hatpath Barua Under Krishi Utpadan Mandi Samiti Jalalabad District Shahjahanpur
Estimated Cost :346139 INR
09 Sep 2026
Uttar Pradesh Supply Of 2 Kw Capacity Rooftof Solar Plant Construction Of Tube Well And Supply Of 1 Hp Capacity Submersible Pump Set And Supply Of Solar Street Light Etc Works For Hatpath Nizampur Under Krishi Utpadan Mandi Samiti Jalalabad District Shahjahanpur
Estimated Cost :346139 INR
09 Sep 2026
Uttar Pradesh Supply Of 2 Kw Capacity Rooftof Solar Plant Construction Of Tube Well And Supply Of 1 Hp Capacity Submersible Pump Set And Supply Of Solar Street Light Etc Works For Hatpath Hardwara Under Krishi Utpadan Mandi Samiti Jalalabad District Shahjahanpur
Estimated Cost :346139 INR
09 Sep 2026
Uttar Pradesh Supply Of 2 Kw Capacity Rooftof Solar Plant Construction Of Tube Well And Supply Of 1 Hp Capacity Submersible Pump Set And Supply Of Solar Street Light Etc Works For Hatpath Mangtora Under Krishi Utpadan Mandi Samiti Jalalabad District Shahjahanpur
Estimated Cost :346139 INR
09 Sep 2026
Karnataka Providing Of 42 Kwp Rooftop Solar Photo Voltaic Power Generation System At Soil And Land Use Survey Of India (slusi), Kodigehalli, Vidyaranyapura Post, Bangalore.
Estimated Cost :2595222 INR
10 Sep 2026
Punjab Tender Invited For Green Energy Project With Solar Light ##quantity: 12 ##
08 Sep 2026
Karnataka Supply Installation Testing Commissioning Of 40 Kwp Roof Top Solar Photo Voltaic Power Generation System With 11 Kv Ht Metering Cubical For Plant Quarantine Station, Hebbal Bangalore.
Estimated Cost :2486662 INR
10 Sep 2026