Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Andhra Pradesh Supply Of 1-phase 5 Kwp Roof Top On Grid Solar Inverter Consisting Of Maximum power Point Tracker(mppt) (5kw Output Pure Sine Wave Inverter) With 5 Year warranty. Makes: Polycab, Havells, Powerone, Luminous, Microtek, sungrow, Growatt Only. .#* Supply Of
22 Sep 2026
Assam Construction Solar Powered Standalone Dw Facility With Ordex System At South Uttar Ambari Ac 128602769 Under The Award Of 15th Fc Tied Grant For The Year 2025-26 During 2026-27.
Dprd/btc/(15th Fc)t(viii)/chi-21/2026/06

Estimated Cost :2650000 INR
29 Sep 2026
Assam Construction Solar Powered Standalone Dw Facility With Ordex System At No.2 Dharampur Part-ii Ac 12854995 Under The Award Of 15th Fc Tied Grant For The Year 2025-26 During 2026-27.
Dprd/btc/(15th Fc)t(viii)/chi-20/2026/06

Estimated Cost :2650000 INR
29 Sep 2026
Karnataka Providing Of 30kwp Rooftop Solar Photo Voltaic Power Generation System At Rconf, Kannamangala Cross, Dodda Bana Halli Road, Bangalore.
Estimated Cost :1943862 INR
21 Sep 2026
India Solarization Through On-grid (grid-tied) – Government Owned Large Cold Storages, Bulk Milk Coolers And Chilling Centres – Baseline Assessment, Site Design, Scheme Unlocking, Demonstration Implementation And Impact Assessment.
09 Sep 2026
Gujarat Supply Installation Testing Commissioning Of 60 Kwp Roof Top Solar Plant At Office Cum Laboratiry Building At Rpqs, Kandla (gandhindham).
Estimated Cost :3256800 INR
14 Sep 2026
Andhra Pradesh Supply Installation Testing Commissioning Of 55 Kwp Roof Top On Grid Solar Photo Voltaic Power Generation System At Pwd Building And Bc Lab At Niphm Campus, Rajendranagar, Hyderabad.
Estimated Cost :2985400 INR
23 Sep 2026
Andhra Pradesh Supplying, Installation, Testing And Commissioning Of Grid Interactive Roof Top Solar Photo Voltaic System At Office Cum Lab Building For Cipmc, Jeedimetla, Hyderabad.
Estimated Cost :1628400 INR
23 Sep 2026
Andhra Pradesh Supply Installation Testing Commissioning Of 200 Kwp Solar Photo Voltaic Power Generation System Administrative Building In Uoh Campus, Hyderabad.
Estimated Cost :10856000 INR
17 Sep 2026
Bihar The Project Involves The Construction And Operation Of A Solar Power Facility With An Integrated Energy Storage System. The Scope Includes The Installation Of Solar Photovoltaic Panels, Inverters, And A Battery Energy Storage System To Ensure Reliable Pow
28 Sep 2026