Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Uttar Pradesh Tender Invited For Off - Grid Solar Photovoltaic (pv) Power Plant (v2) ##quantity: 1 ##
13 Jul 2026
Rajasthan Tender Invited For Supply Of Bos, Installation– Commissioning And 5 Years Maintenance Of 10 Kwp Roof Top Grid Connec ##quantity: 10 ##
Estimated Cost :253700
04 Jul 2026
Andhra Pradesh Providing Additional Streerlighting Inside Gail Dt Premises, 300 Kw Ground Mounted Solar Plant Area And Perimeters Of Security Lighting, Vizag
22 Jul 2026
Odisha Rechargeable Led Based Lamp 100w Specification- Led 244 Quantity (234 White 5 Red 5 Blue), Solar Charging Panel : Inbuilt, Operation Mode-3(high,low And red&blue Blinking), Battery- 16000mah Lithium, Adapter-5v2a, Charging Voltage- 180 -270 Vac 50hz,opera
13 Jul 2026
Maharashtra Tender Invited For Off - Grid Solar Photovoltaic (pv) Power Plant (v2) ##quantity: 151 ##
13 Jul 2026
Gujarat Tender Invited For 12 Watt White-led Based Solar Street Lighting System As Per Mnre Specification ##quantity: 96 ##
13 Jul 2026
Kerala Estimate For The Cost Of Maintenance Of Five Line Solar Power Fencing From Pannimoola To 8th Block Under Kochukoickal Fss Under Goodrickalrange During 2026-27
Estimate For The Cost Of Maintenance Of Five Line Solar Power Fencing From Pannimoola To 8

Estimated Cost :293415 INR
10 Jul 2026
West Bengal Aic/aed/niet-52(2nd Call)/26-27/gr_1
Supply And Installation Of Solar Highmast Lighting System With Complete Set

Estimated Cost :1889003 INR
17 Jul 2026
West Bengal Dismantling Of 425kwp Rooftop Solar Plant On Charge Basis At F-shop Shed, Shifting And Re- installation Of 425kwp Rooftop Solar Plant With Additional Required Materials On Charge Basis At J- shop Shed Of Carriage & Wagon Workshop, Liluah On Single Tender
Estimated Cost :6297424
16 Jul 2026
Rajasthan Kota - Nad & Rma-bpl Section :- Provision Of Solar Power Plants On The Rooftops of Stations, Service Buildings, Residential Quarters And Lc Gates With Provision For service Amc & Cleaning Of Solar Panels (780 Kwp X 3 Years = 2340 Kwp Years) (unit Each = K
Estimated Cost :37295317
20 Jul 2026