Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Uttar Pradesh Sitc Including Comprehensive Warranty And Maintenance For Five (05) Years, Of 1 Kw To 75 Kw Off Grid Solar Power Plants Under Capex Mode At Various Govt. Buildings In The State Of U.p, As Per Specification Given In Scope Of Work Of Bid Document
Estimated Cost :242600000 INR
15 Sep 2026
Uttar Pradesh Sitc Including Comprehensive Warranty Maintenance For 5 Years Of 1 Kw To 500 Kw On Grid Solar Rooftop Power Plant Under Capex Mode At Various Govt. Buildings In The State Of Uttar Pradesh As Per Specification Given In Scope Of Work Of Bid Document.
Estimated Cost :554600000 INR
15 Sep 2026
Uttar Pradesh Sitc Including Comprehensive Warranty And Maintenance For Five (05) Years, Of 1 Kw To 75 Kw Hybrid Solar Rooftop Power Plants With Hybrid Inverter And Battery Backup Under Capex Mode At Various Govt, Buildings In The State Of Uttar Padesh.
Estimated Cost :246700000 INR
15 Sep 2026
Haryana Sirsa Town- Installation O...
Installation Of Sollar Power Plant With On Grid System To Minimize Electricity Charges.

Estimated Cost :8165701 INR
31 Aug 2026
Haryana Sirsa Town- Dnit For Insta...
Installation Of Sollar Power Plant For Mps Of 12.50 Mld Stp Nattar Road Sirsa.

Estimated Cost :8165957 INR
31 Aug 2026
Uttarakhand Design Manufacture Supply Installation Testing And Commissioning Of 01 W Off Grid Solar Pv Power Plants At Various Government Schools And Aanganwadi Centres Of District Nainital Including 05 Years Warrantee And Comprehensive Annual Maintenance
Estimated Cost :2750000 INR
04 Sep 2026
Uttarakhand Survey Supply Installation Testing And Commissioning Sitc Of Grid Connected Solar Pv Power Plant Including All Associated Electrical, Civil And Mechanical Works On Ground Or Suitable Location At Gujronwali Office Campus Under Nathuwawala Water Scheme
Estimated Cost :5921900 INR
03 Sep 2026
Uttarakhand Survey Supply Installation Testing And Commissioning Of Grid Connected Solar Pv Power Plant Including All Associated Electrical Civil And Mechanical Works On Ground Or Suitable Location At Ayudh Vihar, Indraprasth Lane No 3 Sgrr Nehrugram Nathanpur
Estimated Cost :7496300 INR
03 Sep 2026
Maharashtra Survey, Design, Fabrication, Supply, Installation, Testing And Commissioning Of Total 52.00 Kwp Of On Grid Connected Rooftop Solar Pvpower Plant Including Comprehensive Maintenance Contract (cmc) For 5 Years
01 Sep 2026
Maharashtra 44.36 Kwp Of On Grid Connected Rooftop Solar Pv Power Plant
02 Sep 2026