Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Maharashtra Providing Solar Highmast Light In Ramai Nagar At Fulumari Tq.manora Dist.washim Under Schedule Cast And Navbudhha Ghatak Vasti Vikas 2025-26
Estimated Cost :593220 INR
29 May 2026
Rajasthan E-tender For Design, Supply, Installation, Testing And Commissioning Of 25 Kwp Each On-grid Roof Top Solar Power Plant Without Battery Bank At Bo-sojat City, Bo Balotara, Bo-bhinmal And Bo Bali Under Do Jodhpur
Estimated Cost :4600000 INR
03 Jun 2026
Gujarat El/ac/2843
Providing Of Solar Street Lights In The Nagavaladiya Village, Anjar Under Csr

Estimated Cost :2426580 INR
11 Jun 2026
Maharashtra Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At. Jevalwahi Tola 1
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At. Jevalwahi Tola 1 In Gp. Chicholi Tah. Dhanora Dist. Gadchiroli

29 May 2026
Maharashtra Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At Kusumtola No. 2
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At Kusumtola No. 2 In G.p. Yerkad Tah. Dhanora Dist. Gadchiroli

29 May 2026
Maharashtra Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At Kusumtola No. 1
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At Kusumtola No. 1 In G.p. Yerkad Tah. Dhanora Dist. Gadchiroli

29 May 2026
Maharashtra Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At Rengatola
Installation Of Solar Energy Based Mini Water Supply Scheme On Borewell/dugwell At Rengatola In G.p. Yerkad Tah. Dhanora Dist. Gadchiroli

29 May 2026
Rajasthan Supply, Installation, Testing & Commissioning Of Grid Connected Roof Top Solar Pv Power Plants Of Different Capacities (minimum 100 Kwp) In Bank’s Branches At Various Locations Under Co Jodhpur Of Punjab National Bank Grid Connected Roof Top Solar Pv Powe
30 May 2026
West Bengal Drilling Installation And Maintenance Of 150 Mm Dia 3 Nos Tw Solar Scheme For Irrigation And Drinking Water Supply Purpose At Goalpokher-ii Block Under Dpmu Uttar Dinajpur, Wbadmip
Drilling, Installation And Maintenance Of 150 Mm Dia Tube Well Solar

Estimated Cost :3432833 INR
08 Jun 2026
Rajasthan Panchayat Samiti And 44 Gram Panchayat Payaljal Karwanye Jane Wale Borwell And Nalkup May Pump Set Solar Penal Sahit Sampuran Karya
Estimated Cost :25000000 INR
14 Jun 2026