Tenderskhoj
India
- Water and Sanitation
LOCATION SUMMARY DEADLINE
West Bengal Panshila,booth No-11, Sl No- 01 And Running Sl No - 80
Construction Of Covered Drain From H/o Kalidas Mondal To Bhim Biswas Pond, Booth No 11, Sansad-pansila,kotra Gp

Estimated Cost :105282 INR
06 Dec 2025
Andhra Pradesh Ebv Display As Per M/s. Kbil Part No. 775354 For Ccb Brake System. .#* Ebv Display As Per M/s. Kbil Part No. 775354 For Ccb Brake System. [ Warranty Period: 30 months After The Date Of Delivery ] ]
19 Nov 2025
West Bengal Installation Of Submersible Pump And Construction Of Over Head Reservoir Near H/o Dilip Sardar., Id No - Apas/01/128/46/0006
Estimated Cost :114235 INR
05 Dec 2025
Telangana Electronic Weighing Scale (trolley/mobile Scale-heavy Duty) Of Make: Tula(preferable) Or equivalent, With Capacity Of 2000 Kg (2 Tonnes) And Platform Size 1000 Mm X 1250 Mm; heavy-duty Industrial Frame Made From C-channel 75 X 40 X 5 Mm; Fitted With 4 Nos
17 Nov 2025
West Bengal Sinking Of New Tube-well Near The House Of Narayan Bera, Son Of Kanailal Bera, Booth No. 106, Ramganga Gp
Estimated Cost :250000 INR
04 Dec 2025
West Bengal Installation Of Solar Submersible Pump At Dakshin Kashi Fp School
Estimated Cost :345684 INR
28 Nov 2025
West Bengal Npg Basirhat Ii N 20 Of 2025 2026 Dt 03 11 2025
Repairing Of Drain With Cover Slab Near Dakshin Kripalpur Fp School At Chaita Gp Of Booth No 93 Under Basir Ii Development Block Under Amader Para Amader Samadhan Fund Ps 93 P 2

Estimated Cost :72954 INR
27 Nov 2025
Delhi Ee M-wz Iv Wz/tc/25-26/21/03
Imp And Dev Of Road/lane And Drainage System By Providing Rmc,brick Work , Cement Plaster And 70 Mm Thick Rcc Slab Etc From H.no.-57 To 79 Near Shubh Nursing Home In Ward No. 108 Hastsal West Zone.

Estimated Cost :1404014 INR
20 Nov 2025
Maharashtra Mp-improvement Of Drainage System And Passage At Balgopal Mandal.datt Mandir Lane In Beat No.206, In F/s Ward.
Estimated Cost :1820496 INR
19 Nov 2025
Uttar Pradesh In Ward-70, Suncity Colony, In Front Of The Electricity House, The Boundary Wall Of The Park Was Constructed, Painted, And Installed, Along With An Open Gym, Swings, Dustbins, And Horticulture.
Estimated Cost :2151600 INR
20 Nov 2025