Tenderskhoj
India
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Haryana Town Annual Mtc. Works For Stp/sewage.
Cc Interlocking Paver Blocks Providing And Laying 80mm Thick Factory Made Cement Concrete Interlocking Paver Block Of M -35 Grade Made By Block Making Machine With Strong Vibratory Compaction, Of Approved Size,

14 May 2024
Tamilnadu Sse/p.way/wst-b Section: Essential Urgent P.way Repair Works To Eliminate Deficiencies On Track In Msb-vpy Section Of Aden/wst Sub-division.
Estimated Cost :7009468 INR
31 May 2024
Haryana Farukh Nagar Town Annual Mtc. Works For Stp/sewage 1 Sewer Related Items/ Job Work For Raising Of Manhole Dismantling Of Existing Slab, Raising Of Brick Masonry On The Existing Walls Of The Manhole Shuttering For Slab Fixing Of Manhole Cover & Frame
Estimated Cost :49600 INR
13 May 2024
Tamilnadu Sr.den/west Jurisdiction - Provision Of Grp Keyman Path Arrangements In Major Psc/rcc Bridges Ajj Kpd Jtj Section And Cgl-ajj-ru Section
Estimated Cost :40344978 INR
31 May 2024
Chhattisgarh Tender For Power Supply To 01 No. 100 Kva Ht Conn To Dr. Kiran Jiwanmall Hospital At Village Bhatapara Under Bhatapara Zone D/c Under (o&m) Division Bhatapara.
Estimated Cost :157254 INR
20 May 2024
Tamilnadu Aden/spe's Jurisdiction - Tfr Of Steel Channel Sleepers On Girder Of Bridge No.167 (dn) & 237 (up & Dn) -1600nos.
Estimated Cost :22056091 INR
31 May 2024
Jammu & Kashmir Improvement Of Existing Sewerage Line Near Residential Qtr And Provision Of Separate Toilet And Bathroom For Male And Female Ward At Mi Room Of 23 Bn Bsf Anupgarh Under Shq Bsf Sgnrunder Shq Bsf Sgnr
Estimated Cost :676567 INR
20 May 2024
Chhattisgarh Tender For Power Supply To 02 No. 150 Hand Pump Ip Connection To M/s Bajaj Udyog Pro. Shri Tushar Bajaj & Nsc Conn To Sarpanch Gram Panchayat Kodapar At Villages Sendri & Kodapar Under Bhatapara I D/c Under (o&m) Division Bhatapara.
Estimated Cost :338656 INR
20 May 2024
Madhya Pradesh Construction Of Bitumen Road And Footpath From Dakbanglow To Mhow Neemuch Road Ward No 14 Pithampur Under Cm Infrastructure Phase 4.
Estimated Cost :3271000 INR
24 May 2024
Tamilnadu Mas-gdr Section-provision Of Keyman Side Pathway (grp Type) For Important Bridge No. 44 Up & Dn Fast Line.
Estimated Cost :21889594 INR
31 May 2024