Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Uttar Pradesh Under Water Repair Of Piers Of Sone (bridge No. 399) At Km 143/2-24 Car-cpu Section And Geological Mapping, Slope Stability Analysis For The Railway Track Slope In The Jurisdiction Of Sr. Den/i/pryj
Estimated Cost :15948400 INR
17 May 2024
Odisha Provision Of Inspection Platform & Inspection Ladder For 14 Nos. Of Psc Girder Bridges In Between Mane-hnpa Section, 11 Nos. Of Robs In Between Sbp-jsgr & Sbp-kpjg Section And Provision Of 26.8m Rh Girder In Sbp-jsgr & Sbp-kpjg Section Of Division.
Estimated Cost :23395230 INR
16 May 2024
spanspan>-Majr-Pmt-bridgespan>-Steel-Super-structure"> Jammu & Kashmir spanspan>-Majr-Pmt-bridgespan>-Steel-Super-structure">Design And Construction Of 45 Mtr Single spanspan> Majr Pmt bridgespan> Steel Super structure
Estimated Cost :34981830 INR
spanspan>-Majr-Pmt-bridgespan>-Steel-Super-structure">07 May 2024
Andhra Pradesh Jagdalpur -kirandul Doubling Project: Execution Of Balance Works Of Earthwork In Formation In Embankment/cutting, Side Drains, Trolley Refuges, Prepared Sub-grade, Blanketing Etc, Construction Of Balance Minor Bridges,side Drains, Protection Works Includi
Estimated Cost :265786593 INR
20 May 2024
Jharkhand Extension Of Existing Fob From Pf No.01 To New Station Building At Birrajpur Between Gamharia & Kandra In Chakradharpur Division.
Estimated Cost :14977585 INR
15 May 2024
Jharkhand Ohe Modification Works In Connection With Provision Of Fob (12m Wide) At Gmh Station Under Amrit Bharat Station Scheme (abss) In Ckp Division Of S.e.railway.
Estimated Cost :4883348 INR
14 May 2024
Tamilnadu Construction Of Road Over Bridge In Lieu Of Existing Level Crossing No.15 At Railway Km 35_30_32 In Between Thirunindravur And Thiruvallur Railway Stations Near Sevvapet_balance Work
02 May 2024
West Bengal Construction Of Rob And Its Approaches In Lieu Of Level Crossing No. 1/t/spl (at Barasat Kazipara) At Km 3.250 On Nh-35 In The State Of West Bengal On Epc. [job No. Nh-35/wb (16)/15-16-021-s&r (b)] & Construction Of Rob And Its Approaches In Lieu Of Exist
Estimated Cost :1599387932
06 Jun 2024
Tamilnadu Construction Of Road Over Bridge In Lieu Of Existing Level Crossing No.128 At Railway Km 151_12_13 Between Vellore Katpadi Railway Stations At Km 118_8 Of Krishnagiri _ Ranipet Road
02 May 2024
Uttar Pradesh Ohe Modification Work Due To Construction Of Limited Height Subway (lhs) (i) At Loc 147/18a- 147/18 For Free Passage Between W-type Residence/hostel & Academic Campus Of Motilal Nehru Nit Allahabad By Box Pushing Under Railway Track On Pfm-prg Section (ii
Estimated Cost :2397627 INR
15 May 2024