Tenderskhoj
Energy & Power Renewable Energy

LOCATION SUMMARY DEADLINE
West Bengal Construction Of (i) 4 Nos. Solar Submersible Pump For Drinking Water (each 4,50,847.00), (ii) 3 Nos Mini Submersible Pump For Drinking Water (each 2,50,000.00), (iii) Community Tollet At Barapalashon Dighir Par Rs, 2,50,000.00 & (iv) Pukur Ghat At Nowpara
05 Apr 2023
Jharkhand Contract For Assistance In Cpp Turbine Operation
Estimated Cost :3686865 INR
27 Apr 2023
Jharkhand Construction Of Rural Pipe Water Supply Scheme Through D.t./hydt Solar Based 1 Hp/ 2 Hp D.c. Motor Pump Complete Set For Different Tolas Of Concern Village Which Is Not Included In Mvs And Has No Electricity Or Less Electricity To Supply Water 2000 Lph Ma
Estimated Cost :883492 INR
06 Apr 2023
West Bengal Installation Of 2.2 Mwp On-grid (without Battery Backup) Solar Roof-top/ Shed-top Plant Over Howrah Division.
Estimated Cost :100602788 INR
21 Apr 2023
West Bengal Installation Of Solar Light (mini High Mast Near Gogra Kali Mandir ( Id-40060920)
Estimated Cost :249248 INR
11 Apr 2023
West Bengal Installation Of 100 Kwp On- Grid (without Battery Backup) Rooftop /shed -top Solar Plant At Stations In Nagarnabi – Gumani Section (nagarnabi -30 Kwp,tilbhita-25 Kwp, Kotalpukur -25 Kwp And Gumani -20 Kwp) Under Ppp Model (phase-i).
03 Apr 2023
West Bengal Installation Of On-grid Solar Plant Of Total Capacity 225 Kwp Through Solar Power Developer (spd) Under Ppp Model (phase-ii).
03 Apr 2023
Tamilnadu Providing Solar Light At Corporation Boys Higher Secondary School, In Ward No.63, Central Zone.
Estimated Cost :255000 INR
05 Apr 2023
Goa Supply Of Emergency Essential Resource Reserve(eerr) Equipments -personal Floatation Device (life Jacket Made Of Polyurethane Foam), Torch Of Emergency Light (solar Enabled) , Safety Gloves (canvas/leather), Lifebuoysoutboard Motor Minimum 30 Hp, Abc Fire
19 Apr 2023
Maharashtra Providing And Erecting Spv Solar Pump System On Ex. Bore At Kahakar Bk Tq Sengaon
Estimated Cost :500000 INR
04 Apr 2023