Tenderskhoj
Energy & Power Non Renewable Energy

LOCATION SUMMARY DEADLINE
Andhra Pradesh Providing Grid-connected Rooftop Solar Plant And Solar-covered Parking Of Capacity 1315 Kwp With A 5 Year Comprehensive Annual Maintenance Including Solar Pv Power Generation Plants On Elevated Structure On The Roof Tops Of Academic, Admin And Lhc Buildin
Estimated Cost :110120 INR
23 Feb 2026
Karnataka Supply, Installation And Maintenance Of A 3kw Solar Grid System For The Digital Library Of Mudaru And Kallya Gram Panchayats In Karkala Taluk And Udupi District.
24 Feb 2026
Madhya Pradesh Tender Invited For Off - Grid Solar Photovoltaic (pv) Power Plant (v2) (q3)##quantity: 1##
27 Feb 2026
Madhya Pradesh Tender Invited For Off - Grid Solar Photovoltaic (pv) Power Plant (v2) (q3)##quantity: 37##
26 Feb 2026
Maharashtra Design, Manufacture, Supply, Installation, Testing And Commissioning With Five Years Comprehensive Maintainance Contract Of On Grid Connected Solar Power Plant (with Net Meter) At Kolewadi Tal Man Dist.satara
Estimated Cost :1027015 INR
30 Dec 2025
Gujarat The Project Involves The Provision Of A Diesel-operated Ac Camper Van With A Seating Capacity Of 4+1 For Staff Transportation On A Monthly Basis. The Scope Includes The Supply, Erection, Testing, Commissioning, And Comprehensive Operation And Maintenance
23 Feb 2026
West Bengal Conduct A Detailed Energy Audit For The Period From April 2024 To March 2025. The Audit Will Assess Various Parameters Including Temperature, Pressure, Electrical Metrics, Illumination, Fuel Consumption, And Energy Utilization Across Different Products. T
05 Mar 2026
Andhra Pradesh Providing Additional 33kv Ht Switch Yard At 1mw Solar Plant Of Pathapadu Near Nunna.
Estimated Cost :6943000 INR
23 Feb 2026
Maharashtra Survey Design Fabrication Supply Installation Testing Andcommissioning Of Total 41.33 Kwp Of On Grid Connected Rooftop Solar Pv Power Plant Including Comprehensive Maintenance Contract Cmc For 3 Years
Survey Design Fabrication Supply Installation Te

25 Feb 2026
Tunisia Gas Engine Power Plants (200 Mw) - (phase 2: Aor)
13 May 2026