Tenderskhoj
Morocco

LOCATION SUMMARY DEADLINE
Morocco Execution Of Anti-erosion Infrastructure Works At A Place Called Tete Oudern, Located In The Territorial Commune Of Adrej, Province Of Sefrou.
Estimated Cost :400074
13 May 2026
Morocco A) Drinking Water Supply Douar Gouassma Ct Od Zerrad B) Construction Of A 100 M3 Reservoir In Douar Od Bouhmad Ct Od Zerrad
Estimated Cost :1263352
30 Apr 2026
Morocco Supply And Replacement Of Composite Insulators For The 400 Kv Lines Of The Laayoune Transport Operations Division: - Lot Ndeg 1: 400 Kv Lines Of The Guelmim-tan Tan Network - Lot Ndeg 2: 400 Kv Lines Of The Tan Tan-laayoune Network
14 May 2026
Morocco Metrological Connection Of Analyzes To The Is By Participation In Proficiency Tests According To Iso 17043
Estimated Cost :96000
05 May 2026
Morocco Purchase And Renewal Of Equipment And Tools On Behalf Of The National Center For Hydrobiology And Pisciculture Of Azrou, Province Of Ifrane, Reporting To The Regional Directorate Of The National Agency For Water And Forests Of Fes Meknes. (single Batch).
Estimated Cost :149580
14 May 2026
Morocco Purchase Of Clothing For The Needs Of The Staff Of The National Center For Hydrobiology And Pisciculture Of Azrou, Province Of Ifrane, Reporting To The Regional Directorate Of The National Water And Forestry Agency Of Fes Meknes (single Lot).
Estimated Cost :199200
14 May 2026
Morocco Planting Work On 177.5 Ha Of Cactus In The C.t Ichemraren Province Of Chichaoua.
Estimated Cost :1603788
30 Apr 2026
Morocco Development Work And Upgrading Of The Headquarters Of The 1st Police District And Adti Service Reporting To The Demnate District Station In A Single Lot
Estimated Cost :989153
07 May 2026
Morocco Services Of Studies And Control Of The Redevelopment Works Of The Administrative Building, The Scenography And The Landscaping Of The Headquarters Of The Tazekka National Park, Province Of Taza
Estimated Cost :300000
11 May 2026
Morocco Carrying Out Studies And Control For The Redevelopment Of The Environmental Education Center And Its Annexes And The Scenographic And Landscaping Development Of The Said Center, Within The Tazekka National Park, Bab Boudir Ct, Taza Province
Estimated Cost :402000
11 May 2026