Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Andhra Pradesh Providing Extra Seating Capacity Of Galleries In North Mada Street From North West Corner To N5a Bridge At Tirumala
Estimated Cost :812136 INR
22 Jul 2025
Tripura Formation Of Road By Earth Filling And Bamboo Pallasiding Starting From Near The House Of Sri. Bulu Sen At Ward No-06 Within Dmc Area, During The Year 2024-2025 Ch.0.00 To 130.00 Mtr Sakaibari 2nd Bridge To Sajal Das House
Estimated Cost :2413280 INR
18 Jul 2025
Uttar Pradesh Special Repair Work Of The Left Guide Bund Located In The Upstream Part Of The Jalimnagar Bridge Situated On The River Ghaghra In District Bahraich (protection Work Of Guide Bund)
Estimated Cost :80100000 INR
12 Jul 2025
Maharashtra Junction Improvement On Shriram Bridge On Murbad Karjat Chouk Lohop Road, Sh-79 In Km 122/450, Tal. Karjat, Dist. Raigad.
21 May 2025
Kerala 438-2025-26 Div12 Thevally Iron Bridge Thazhe Olayil Kadavu Corner 2 Lane , Tra Kallukadakkal Jayan Nagar Nani Memmorial Health Office - Excel Nagar Biscuit Company Market Puthuval Purayidam , Icd Coaching Centre District Panchayath Drain Covering
4

Estimated Cost :2960626 INR
18 Jul 2025
Odisha Construction Of Four Lane Road Over Bridge (rob No. 413) On New B.g. Line From Khurda Road- Bolangir And Its Approaches At Km. 134.274 (charichhak) Of Nh-57 In The State Of Odisha On Epc Mode
Construction Of Four Lane Road Over Bridge (rob No. 413)

Estimated Cost :660200000 INR
30 Jul 2025
Odisha Construction Of Four Lane Road Over Bridge (rob No. 399) On New B.g. Line From Khurda Road-bolangir And Its Approaches At Km. 138/435 (village Kardakotha) Of Nh-57 In The State Of Odisha On Epc Mode
Construction Of Four Lane Road Over Bridge (rob No

Estimated Cost :735700000 INR
30 Jul 2025
Odisha Construction Of Four Lane Road Over Bridge (rob No. 357) On New B.g. Line From Khurda Road-bolangir And Its Approaches At Km. 156/088 (village Baringi) Of Nh-57 In The State Of Odisha On Epc Mode
Construction Of Four Lane Road Over Bridge (rob No. 3

Estimated Cost :711800000 INR
30 Jul 2025
Himachal Pradesh Patch Work On Various Road Under Kaza Division For The Year 2025 26 Under Mmsrry
Sh Providing And Laying Mix Seal Surfacing For Patch Work At Various Rds On Rangrik Bridge To Kibber Road Km 3 00 To 4 00 Rangrik Bridge To Kibber Road Km 7 00 To 15 50

Estimated Cost :4180451 INR
15 Jul 2025
Tamilnadu Construction Of Road Over Bridge In Lieu Of Existing Lc.no.5 In Between Irugur - Peelamedu Railway Stations At Railway Km 3/21-23 On Neelikonampalayam - Sihs Colony Road At Km 1/6 Near Sihs Colony (phase-i Km 0/0-1/0)
Estimated Cost :201200000 INR
08 Apr 2025