Tenderskhoj
India
- Infrastructure Airports
LOCATION SUMMARY DEADLINE
Punjab Comprehensive Airfield Maintenance In Aor Of Age B/r-iii Under Ge(north) Bathinda At Bathinda Mil Stn
Estimated Cost :4500000 INR
04 Apr 2026
Andaman and Nicobar Islands (UT) Profile Correction Of Link Taxiway From Main Runway To Phl Dispersal Including Grading And Allied Works At Veer Savarkar International Airport
Estimated Cost :3718045 INR
17 Mar 2026
West Bengal Certain Misc B/r Repair Work For Runway At Af Stn Arjan Singh Under Ge (af) Panagarh
Estimated Cost :1500000 INR
21 Mar 2026
Punjab Repair To Joinery Brickwork Plastering Flooring, Plumbing Saintary Fitting, Tiling And Chajja Repair Work In Certain Bldgs Of North Of Runway In Tech Area At Af Stn Adampur
Estimated Cost :4000000 INR
30 Mar 2026
Maharashtra Periodical Services To Grills Compound Wall Kerb Stone Roof Road And Runway Marking Paints And Repair To Kerb Stone Precast Articles Footpath Pavement Joints Under Zone C Area At Nda Khadakwasla
Estimated Cost :4900000 INR
24 Mar 2026
Tamilnadu Annual Maintenance And Repair Contract (civil Work) At Tuticorin Airport For The Year 2026 To 27 Sh Terminal Building, Atc Tower, Fire Station, Runway, Taxiway, Apron Including Other Ancillary Buildings, Compound Wall Etc. In Operational Area
Estimated Cost :3000000 INR
23 Mar 2026
Tamilnadu The Project Involves The Annual Maintenance And Repair Of Civil Works At Tuticorin Airport For The Year 2026-27. This Includes The Upkeep Of The Terminal Building, Atc Tower, Fire Station, Runway, Taxiway, Apron, And Other Related Structures Within The Op
23 Mar 2026
Assam Repairs To Drain, Culvert, Cleaning Stone Pitching, Grass Cutting And Shoulder Dressing To Runway Area In Tech Area At Afs Under Ge (af) Jorhat
20 Mar 2026
Punjab Repair To Runway Flexible Portion With Patch Material, Strengthening Of Shoulders, Painting And Repair To Connected Link Roads Hardstanding At Af Stn Chandigarh
19 Mar 2026
Andhra Pradesh The Project Involves The Installation And Operationalization Of A Secondary Runway Landing System, Focusing On The Necessary Equipment And Services To Ensure Its Functionality. Installation And Operationalization Of Landing System For Secondary Runway
17 Mar 2026