Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
West Bengal Construction Of R S J Bridge At Karala Vally T.g Near House Of Dashai Munda (1x 12.00m) At Arabinda Gp Sadar Block Jalpaiguri
Estimated Cost :2822052 INR
06 May 2025
Delhi Maintenance Of Civil Work Addition, Alteration Modification Of Various Building, Viaduct And Stations From Qutub Minar To Arjangarh Metro Stations Including Qutub Minar Ramp And Sultanpur Depot In Line-2. (for 3 Years).
Maintenance Of Civil Work Add

Estimated Cost :48704000 INR
22 May 2025
West Bengal Wbpwd/rd/ee/bshd/nit02/25-26/7
Re-construction Of Left Side Wing Wall (towards Gotan) Of Sanknara Bridge At 4.80 Km Of Raina Damuniya Road Under Sadarghat Highway Sub Division No-i Of Burdwan South Highway Division In The District Of Purba Bardhaman

Estimated Cost :695408 INR
03 May 2025
Kerala General Construction And Widening Of Panchikkattukadavu Bridge Approach Road In Neyyattinkara Constituency
General Civil Work

Estimated Cost :16664396 INR
06 May 2025
Kerala Kiifb-construction Of Chavaramuzhi Bridge Across Kuttyadi River Connecting Maruthomkara Panchayath And Chakkittapara Panchayath.
Construction

Estimated Cost :77872374 INR
05 May 2025
Kerala General-construction Of Chittoor Kadavu Bridge Across Achankovil River Under Konni Constituency In Pathanamthitta District- Construction Of Chittoorkkadavu Bridge- General Civil Work
Estimated Cost :95356044 INR
05 May 2025
Himachal Pradesh Construction And Metalling Tarring Mata Chintpurni To Amlehar Road From Km 000 To 9350 Sh Construction Of 14 40 Mtr Span Cc Rcc Solid Slab Bridge Over Dhalwari Khad At Rd 4 155
Estimated Cost :8391489 INR
28 Apr 2025
West Bengal Construction Of R S J Bridge At Karala Vally T.g Near House Of Dashai Munda (1x 12.00m) At Arabinda Gp Sadar Block Jalpaiguri
Estimated Cost :2822052 INR
17 Mar 2025
Rajasthan Construction Of High Level Bridge On Bedach River In Delwas Village Distt. Chittorgarh
Estimated Cost :170300000 INR
12 May 2025
Haryana Consultancy Services For Preparation Of Detailed Project Report Dpr For Upgradation Of Existing 2 Lane Road To 4 Lane Road Connecting Sector 2325 Diving Road And Leading Towards Nh-07 Approx. Length 870 Meters Including Design Of Major Bridge On Nad
17 Jan 2025