Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Andhra Pradesh Providing Cement Concrete Drain & Culvert From More Ramadevi House To Chitturi Nageswara Rao House In Cherukuri Bazar 26th Ward
Estimated Cost :462198 INR
03 Dec 2022
Chhattisgarh Construction Of High Level Bridge I/c Approach Road Across (1) Asna Khori Nala In Km 6/6 And (2) Khaira Dhodhi Nala In Km 7/2 Of Daldhowa – Ranhat Road.
Estimated Cost :47276000 INR
21 Dec 2022
Andhra Pradesh Construction Of Cement Concrete Drain At Mahadashyam Rama Rao House,cc Culverts At Ch.atchyuta Rao House And G.simhachalam House At Satyanarayana Puram, Cement Concrete Drain And Road From Inumula Peda Gourunaidu House To Reddy Suryanarayana House At Ponu
Estimated Cost :189800 INR
16 Dec 2022
Chhattisgarh Construction Of High Level Bridge I/c Approaches Across Chandabeda Nalla In Km.4/2 On Badedongar-ghotiyamunda-chandabeda Road.
Estimated Cost :40919000 INR
21 Dec 2022
Chhattisgarh Construction Of High Level Bridge And Approach Road Across Gej River On Geji To Nawapara To Road.
Estimated Cost :58394000 INR
21 Dec 2022
Chhattisgarh Construction Of High Level Bridge I/c Approach Road Across (1) Devdhar Nala In Km 4/8 And (2) Harindubba Nala In Km 5/2 Of Jamwantpur - Bhitiyahi
Estimated Cost :66738000 INR
21 Dec 2022
Chhattisgarh Construction Of High Level Bridge I/c Approach Road Across Choliha Nala On Dindo - Chera Road.
Estimated Cost :29990000 INR
21 Dec 2022
Chhattisgarh Construction Of High Level Bridge I/c Approach Road Across Pangan River On Sanawal – Pachawal - Trishuli Road In Km 4/2
Estimated Cost :57286000 INR
21 Dec 2022
Chhattisgarh Construction Of Rural Roads Under Pradhan Mantri Gram Sadak Yojana (pmgsy) - Bhatarimau To Koleng Part-2 (15.00km) 2. Construction Of Rural Roads Under Pradhan Mantri Gram Sadak Yojana (pmgsy) - Nakatoka To Badrenga Road (0.75km) 3. Construction Of Rural
08 Dec 2022
Chhattisgarh Renovation Of Head Work From R.d. 0 To 840 M, Remodelling And C.c.lining Of Main Canal From R.d. 0 To 3900 M , Construction Of 8 No.structure (02 No.v.r.b.,01 No. Fall Cum V.r.b And 05 No. Fall) And 10 No Outlets Of Lahsunwahi Tank Scheme Of Nagri Block O
Estimated Cost :19766027 INR
15 Dec 2022