Tenderskhoj
India
- Industry
LOCATION SUMMARY DEADLINE
Tamilnadu Round Headed Lock Bolt .#* Round Headed Lock Bolt 19.05 Mm Dia. Grip No.20 With Collar With Required grip Range 31.75 Mm To 38.10 Mm,to Rdso Specification Is/rdsowd/0001:2022" Rev.nil Of June 22. [ Warranty Period: 30 Months After The Date Of Delivery ] [
27 Mar 2026
Uttar Pradesh Kota Stone Tiles Work On Office Building In District Ghaziabad
26 Mar 2026
Haryana Bandr/71143/iocl/area Development/site/lc/ Nit/05
Development Of Crane Erection Area And Rebuilding Of Approaches At South Side Incl Area Grading Soil Hardening And Approach Road Construction Related To Civil Structural And Piping Works For Ms Block

25 Mar 2026
Uttar Pradesh Driver Seat Assembly With Reclining, Sliding And Height Adjustment Mechanism, As Per drg. No. 11811717 Alt. %u2018z%u2019 Spec :hhp/veh/001, Specification For Cleaning, marking And Packing Misc.444 .#* Driver Seat Assembly With Reclining, Sliding And Heig
27 Mar 2026
Tamilnadu Renovation And Maintenance Of Roof Sheets And Side Cladding With Structural Painting For Fan Testing System Shop Factory At Bhel Bap Ranipet
Estimated Cost :6085930 INR
30 Mar 2026
Kerala Supply Of Iml Pp Polymer 5 Ltr Jar For Ghee
26 Mar 2026
Haryana Bandr/71148/iocl/elec And Instr/site/lc/nit/01
Carrying Out Various Electrical And Instrumentation Works As Per Eil Standard Specification In Connection With The Composite Work For Utilities And Offsites Part B Project Of Iocl Panipat Refinery Harya

Estimated Cost :19644069 INR
25 Mar 2026
Rajasthan Urgent Repair And Maintenance Head Regulator Gates Of Direct Offtaking Minors Of R.m.c. Km. 65.20 To 78.50
Estimated Cost :197000 INR
01 Apr 2026
Uttar Pradesh Holder For Traction Motor Suspension Of Wap-7/wag-9 Loco .#* Holder For Traction Motor Suspension Of Wap-7/wag-9 Loco As Per Clw Drg. No. 1209-01- 118-002, Alt-2 Or Latest And Abb Drg. No. Ib011-00193 Or Latest. [ Warranty Period: 30 Months After The D at
27 Mar 2026
Himachal Pradesh Hed/422/2025-26, - Tender For Proposed 11/0.4kv, 100 Kva S/stn For Sop To 36kw Load To Led Light Fixtures & Supply And Installion Of Rev -fwd Dg -eb Sync Panel , 58 Kva Dg Set & Other Accesories (4 Nos Earthing For Dg & Panel , Cable For Dg To Panel.) In
Estimated Cost :1493611 INR
27 Mar 2026