Tenderskhoj
India
- Consultancy Legal
LOCATION SUMMARY DEADLINE
Odisha Providing Interior Works Civil, Electrical , Hvac , Extinguisher System , Data Networking System For Proposed O Chip Program Facility Unit At 1st Floor, B Block, Ocac
08 Apr 2026
Tamilnadu Annual Maintenance Contract For Maintenance Of Township Quarters, Public Buildings, Construction Of Civil And Structural Steel Works, Interior Decorations, Water Supply, Road Patch Works, Drains, Sewers, Horticulture Etc., In Bhel, Township, Trichy-
06 Apr 2026
Uttar Pradesh Design And Construction Of 02 Lane (carriage Way 10.50m) R.o.b. No. 205c In Distt- Kasganj U.p. On Epc Mode
Design And Construction Of 02 Lane (carriage Way 10.50m) R.o.b. No. 205c Between Rail Section Of Kanpur-anwarganj-kasganj, Rudain, Daryaoganj

Estimated Cost :485073478 INR
25 Apr 2026
Telangana Tender Invited For Supply Of Interior Design Items For Emi Shelter As Per Annexure-e##quantity: 3##
28 Mar 2026
Andhra Pradesh De-silting Of Drains In A) From Uphc Gavaraveedhi To Adari Lakshmana Rao In Devinagar B) From Sri Krishna Aluminium Interior Works To Mpp School Turakabadi In Ward No.06 Of Narsipatnam Municipality (2nd Call)
Estimated Cost :123899 INR
02 Apr 2026
Andhra Pradesh Execution Of The Balance Works For 6l Of The Existing 2l I. Nandigama Bypass(design Km 220.700 To Km 227.480) And Ii. Kanchikacherla Bypass(design Km 238.200 To Km 245.760) On Nh-65 In Ap Under Risk And Cost Of The Epc Contractor On An Item Rate.
Estimated Cost :48520182 INR
13 Feb 2026
Andhra Pradesh Interior Furnishing Works At New Premises Of Tadigadapa Branch. Interior Furnishing, Partitions, Storage Units, Tables, Blinds, Glass Doors, Wall Paneling, Ceiling Systems, Suggestion Box
08 Apr 2026
Uttarakhand Consultancy Services To Prepare Institutional Development Plan For Ulmmc
28 Apr 2026
Bihar Hbchrc/cssd/works/26/05
Interior And Modification Works For Cssd It Server Room And Kitchen At Hbch And Rc Muzaffarpur Bihar 842004

Estimated Cost :17283000 INR
15 Apr 2026
Tamilnadu Tender Invited For Hiring Of Consultants - Milestone/deliverable Based - Subject Matter Experts; Engineering Design; Yes; Hybrid(as Specified In Scope Of Work)##quantity: 1##
Estimated Cost :100000
30 Mar 2026