Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Construction Of Minor Bridge On Budaki To Odr-38 Approach Road At Budaki Village, Tal. Shirpur, Dist. Dhule
Estimated Cost :34654038 INR
28 Sep 2024
Maharashtra Construction Of Bridge With Improvement To Old Manjrod To Japore Road Vr-81 Km.0/00 To 4/00 Tal.shirpur Dist.dhule
Estimated Cost :32155835 INR
28 Sep 2024
Rajasthan Preparation & Submission Of General Arrangement Drawing (gad), Detailed Design Drawing Duly Proof Checked, Topographical Survey, Land Acquisition Plan, Utility Shifting Plan Etc. And Based On Above Submitting The Detailed Project Report For Rob (06 Nos) B
Estimated Cost :7311014 INR
14 Oct 2024
Odisha Providing And Fixing Single Piece Spring Inserted Reusable Lock Nuts M-27 For Hook Bolt On Steel Girder Bridges Under The Jurisdiction Of Den/central Of Division.
Estimated Cost :12075417 INR
16 Oct 2024
Punjab Estimate For Concrete Lining Of Chohat Disty From Rd 0-20000 Including Reconstruction Of Fall At Rd 550, Vr Bridge At Rd 3500 And Rd 6877 Of Chohat Disty .
Estimated Cost :33340539 INR
14 Oct 2024
West Bengal Short E-n.i.t No - Wbiw/ee/mdd/s.e-nit-3e/24-25/2
Extreme Emergent Repair Of Wooden Bridge At Ch 580 Over Hobka Khal At Korabeghat In Block Joynagar I Ps Mograhat Dist South 24 Paraganas Of Mograhat Irrigation Sub-division Under Mograhat Drainage Di

Estimated Cost :502936 INR
24 Sep 2024
West Bengal Short E-n.i.t No - Wbiw/ee/mdd/s.e-nit-3e/24-25/1
Extreme Emergent Repair Of Wooden Bridge Over Mandirbazar Khal At Ch 80 At Mouza Dhanpota In Block Mograhat I Ps Mograhat Dist South 24 Paraganas Of Mograhat Irrigation Sub-division Under Mograhat Dr

Estimated Cost :146685 INR
24 Sep 2024
Maharashtra Epc Kn-ii (5b) Reconstruction And Widening Of Bridges Culverts And Road
Estimated Cost :1795407179 INR
28 Sep 2024
West Bengal Balagarh Inchura Road From 0.00 Km To 5.00 Km (right Side Shoulder) Urgent Restoration Of Damages Made By Phe Department During Their Distribution Pipe Laying Work Of Bansberia Highway Sub Division-i Under Hooghly Highway Division -ii In The District Of H
04 Oct 2024
Gujarat Special Repair To Major Bridge At 8/800 To 9/00 (by Providing Gunniting, Epoxy Grouting, Jacketing & Crash Barrier) On Halvad-tikar Road Cd No.8/01. Dist.(job No.sr/mrb/2023-24/4).
Estimated Cost :1391428 INR
03 Oct 2024