The Scope Of Work Includes The Design, Manufacture, Inspection, Testing, Proper Packing, And Delivery Of The Illumination System For The Gis Building, Control Room Building, Outdoor Switchyard, And Street Lighting. The Contractor Is Responsible For The Co
TK ID 519719219
Document Type
Tender Notice
Tender Summary
The Scope Of Work Includes The Design, Manufacture, Inspection, Testing, Proper Packing, And Delivery Of The Illumination System For The Gis Building, Control Room Building, Outdoor Switchyard, And Street Lighting. The Contractor Is Responsible For The Co
Action Deadline
30 Sep 2025
Don't have an account yet?Sign up here.