29258091-top And Bottom Gasket .#* Top And Bottom Gasket Of Mr Blower Of 3- Phase Locomotives As Per Clws Drg.no.120 9- 11.344-032(alt.-2 ). Shelf Life Of This Item Is 12 Months. Therefore, Material Should Be Delivered Wit hin 3 Months After Manufacturing
TK ID 534101771
Document Type
Tender Notice
Tender Summary
29258091-top And Bottom Gasket .#* Top And Bottom Gasket Of Mr Blower Of 3- Phase Locomotives As Per Clws Drg.no.120 9- 11.344-032(alt.-2 ). Shelf Life Of This Item Is 12 Months. Therefore, Material Should Be Delivered Wit hin 3 Months After Manufacturing
Action Deadline
03 Nov 2026
Don't have an account yet?Sign up here.