Tenderskhoj
Poland
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Poland [od5-rd9/ri] Connection Of Facilities In Podgórze, Commune To The Power Grid. Czlopa
08 Jul 2024
Poland Station 110/15 Przechowo Comprehensive Modernization Of The 110 Kv Switchgear. Technical Design And Construction.
08 Jul 2024
Poland Construction Of A 15/0.4kv Transformer Station And An Mv Cable Line Along With The Construction Of Connectors And A Lv Cable Line To Power Plot No. 77/14-77/28, District 0009 Wierzchucice, Commune. Insko
09 Jul 2024
Poland Construction Of A Selective Municipal Waste Collection Point In Koczala
09 Jul 2024
Poland Reconstruction Of The 110/15 Kv Gpz Strzelce Krajenskie Station In Order To Connect A Res Generator (design + Construction).
15 Jul 2024
Poland W - Performance Of Works Under The Framework Agreement; Olsztyn Branch; Installation Of Lv Connections/cable Lines With A Length Of 31 To 60 Meters, In The Area Of ??rd Ketrzyn
02 Jul 2024
Poland Construction Of Parking Spaces With A Ramp For Disabled People, A Sidewalk And Renovation Of Field Stairs As Part Of The Project Titled: "modernization Of The Sidewalk Along Ul. Chalubinskiego 13- Walbrzych Participatory Budget 2017"
04 Jul 2024
Poland Renovation Of Vacant Apartment No. 5 In The Building At Ul. Szkolna 12 In Walbrzych In The "design And Build" Mode (single-stage).
05 Jul 2024
Poland Renovation Of Vacant Apartment No. 5 In The Building At Ul. Szkolna 12 In Walbrzych In The "design And Build" Mode (single-stage).
05 Jul 2024
Poland Reconstruction Of Dirt Roads In The Nowy Tomysl Commune
05 Jul 2024