Tenderskhoj
Bhutan

LOCATION SUMMARY DEADLINE
Bhutan Contract Award: Consultancy Services For Shear Wave Velocity Testing And Seismic Site Classification For Dzongkhag Throm/thromde, Rural Town And Yenlag Throm For Updating Seismic Aspects Of The Building Code: Package Aproject Id: P175081 procurement Metho
02 Sep 2026
Bhutan Contract Awarded For: Construction Of Steel Concrete Composite Bridge (35 M Span) (churalum) Construction Of Steel Concrete Composite Bridge (35 M Span) (churalum) Contract Value (nu.): 48125593.050 Date Of Letter Of Acceptance: 20-may-2026 Date Of Contra
Estimated Cost :48125593
04 Mar 2028
Bhutan Contract Award: Consultancy Services For Hiring Of Design Consultant For Dorjilung Hydropower Projectproject Id: P501271 procurement Method Quality Based Selection language Of Notice English bhutan:dorjilung Hydroelectric Power Project.consultancy Service
01 Sep 2026
Bhutan Contract Awarded For: Procurement Of Scouts' Scarves And Flags For 2026-2027-dep Procurement Of Scouts' Scarves And Flags For 2026-2027-dep (scout Scarves, Wood Badge Scarves, Scout Flags/national Flags - Scout Flags National Flags, Wosm Flag) Contract Va
Estimated Cost :820500 BTN
30 Jun 2027
Bhutan Contract Awarded For: Procurement Of Furniture Procurement Of Furniture Contract Value (nu.): 549180.000 Date Of Letter Of Acceptance: 26-may-2026 Date Of Contract Signing: 27-may-2026.procurement Of Furniture
Estimated Cost :549180 BTN
06 Dec 2026
Bhutan Contract Award: Hiring Of Transaction Advisorproject Id: P182008 procurement Method Direct Selection language Of Notice English bhutan:project Preparation Of The Dorjilung Hydro-electrical Power Project.hiring Of Transaction Advisor
28 Aug 2026
Bhutan Contract Awarded For: Procurement Of Ssl Certificate Procurement Of Ssl Certificate Contract Value (nu.): 112392.000 Date Of Letter Of Acceptance: 25-may-2026 Date Of Contract Signing: 27-may-2026.procurement Of Ssl Certificate
Estimated Cost :112392 BTN
30 Jun 2026
Bhutan Contract Awarded For: Supply And Installation Of Firewall And Core Switch Replacement In The Server Room At Ecb Supply And Installation Of Firewall And Core Switch Replacement In The Server Room At Ecb Contract Value (nu.): 1347152.000 Date Of Letter Of A
Estimated Cost :1347152 BTN
30 Jun 2026
Bhutan Contract Awarded For: Establishment Of Eccd At Chumey, Chumey Gewog, Bumthang Establishment Of Eccd At Chumey, Chumey Gewog, Bumthang Contract Value (nu.): 3464415.000 Date Of Letter Of Acceptance: 17-may-2026 Date Of Contract Signing: 19-may-2026.establi
Estimated Cost :3464415
30 Nov 2026
Bhutan Contract Awarded For: Construction Of Boxcut Bypass From Tsachu Top - Jigmecholing (ch. 9.2 - 19.314 Km), Package Ii. Works Consists Of: 1. Earthworks (formation Cutting & Embankment) 2. Permanent Works (retaining Walls, Brest Walls, And Gabion Walls) 3.
Estimated Cost :753959777 BTN
17 Oct 2028