Tenderskhoj
LOCATION SUMMARY DEADLINE
Madhya Pradesh Supply, Installation, Testing And Commissioning Sitc Of 110-inch Professional Grade Display Panel At Ujjain Smart City Limited- 2nd Call
29 Apr 2026
Chhattisgarh Selection Of Agency For Operation, Maintenance, Upkeep Of Bincube Incubation Center By Bilaspur Smart City Ltd At 3rd Floor Of Central Library, Bilaspur, Chhattisgarh Under Licensee Model Where License Will Be Awarded To Agency Who Bids Highest Commercial
27 Apr 2026
Jharkhand Comprehensive Annual Maintenance Of 11 Nos Lift (make- Tk Elevator) Installed In The 11 Nos Minister Bungalow At Smart City, Ranchi For Three Year.
Estimated Cost :3539646 INR
17 Apr 2026
Chhattisgarh (i) Estimate For 63 Kva 11/0.4 Kv For 10 K.w. Dlf Conn.(1010257805) Shri Jethalal Bhai Patel S/oshri Dana Bhai Patel At Opp-kartikey Mandir Akash Marg Under Nnz (ii) Estimate For 63 Kva 11/0.4 Kv For 30 K.w.ndlf Connection (1010302748) To Smt. Ritu Jain W
Estimated Cost :185617 INR
28 Apr 2026
Jammu & Kashmir Supply, Installation, Testing And Commissioning Of 250 Kva Servo Voltage Stabilizer And Other Allied Works At Iccc Building With An Operation And Maintenance Period Of 3 Years Under Jammu Smart City Project
Estimated Cost :1890750 INR
27 Apr 2026
Uttar Pradesh Leasing Out 25 Variable Message Sign Display Boards-size 4.5 Sqm And 30 Led Display Screens-size 11.05 Sqm For 03 Years In Aligarh City Under Smart City Mission
13 Apr 2026
Delhi Providing Smart Ai Based Digital Battery Regeneration Machine Ai Based Digital Pulsation Battery Regeneration Machine, Smart Digital Battery Discharger & Sensor Based Capacity Tester, Digital Smart Battery Charger Set With Adjustable, All In One Digital B
16 Apr 2026
Madhya Pradesh Simhsath Mela Karyalay, Kothi Road, Ujjain Smart City Office
23 Apr 2026
Gujarat Construction Of A New Smart Anganwadi (nand Ghar) In Place Of The Dilapidated Anganwadi Centres No. 59 Located At Slum Board, Near Trikoniya Baug And 156 Located At Ruva Panchayat Behind, Primary School In The Uttar Krushnagar- Ruva Ward Area Of Bhavnagar
Estimated Cost :7177000
01 May 2026
Gujarat Construction Of A New Smart Anganwadi (nand Ghar) In Place Of The Dilapidated Anganwadi Centres No. 164, Located At Upper Coat Area , Front Side Sharmaliya Dada’s Temple And 165, Located At Balavantray Society Front Side Shivji Temple In The Ghogha Circle
Estimated Cost :7177000
01 May 2026