1) Construction Of A Road Over Bridge Consisting Of A 1 X 36.0 M Composite Girder
and 2 X 24.0 M Composite Girders (bridge Proper) For The Railway Portion In Lieu Of
lc No. 246, Along With 8 X 25.040 M C/c Rcc T-beam Girders On Kanheipur/nh-16
side & 6 X