Contract Awarded For Berlin Txl - Utr - 1st Ba - Demolition Of The Runway Bridge And Ramps
as Part Of The Construction Preparation Measures, The So-called Taxiway Bridge Is To Be Dismantled On The Airport Site Within The First Construction Phase. Followin
TK ID 527589364
Document Type
Contract Awards
Tender Summary
Contract Awarded For Berlin Txl - Utr - 1st Ba - Demolition Of The Runway Bridge And Ramps
as Part Of The Construction Preparation Measures, The So-called Taxiway Bridge Is To Be Dismantled On The Airport Site Within The First Construction Phase. Followin