Contract Awarded For Bkp 215.2 Facade Construction In Metal starting Point: The Municipality Of Ittigen Planned The Development Of The Central Area "zentrum Rain", Which Has Existed Since The 1970s And Was Originally Designed For 20,000 Inhabitants. A Mas
TK ID 524990142
Document Type
Contract Awards
Tender Summary
Contract Awarded For Bkp 215.2 Facade Construction In Metal starting Point: The Municipality Of Ittigen Planned The Development Of The Central Area "zentrum Rain", Which Has Existed Since The 1970s And Was Originally Designed For 20,000 Inhabitants. A Mas
Action Deadline
22 Mar 2026
Don't have an account yet?Sign up here.