Contract Awarded For Infrastructure Ex-post infrastructure Measures In The Schoolyard Of An Existing School: Civil Engineering And Sewer Works, As Well As Parallel Landscaping Work As A Renovation Of The Existing Facility. Remove And Install Topsoil And S
TK ID 523832102
Document Type
Contract Awards
Tender Summary
Contract Awarded For Infrastructure Ex-post infrastructure Measures In The Schoolyard Of An Existing School: Civil Engineering And Sewer Works, As Well As Parallel Landscaping Work As A Renovation Of The Existing Facility. Remove And Install Topsoil And S
Action Deadline
06 Feb 2026
Don't have an account yet?Sign up here.