Contract Awarded For S2 Platform Adjustment Nbg. Bs 2 Line 5904 Construction Performance as Part Of The Second Construction Phase, A Track Elevation Is Required At The Stations Of Line 5904 Nürnberg Ostring, Mögeldorf, Schwaig, And Röthenbach To Enable Ba
TK ID 521369286
Document Type
Contract Awards
Tender Summary
Contract Awarded For S2 Platform Adjustment Nbg. Bs 2 Line 5904 Construction Performance as Part Of The Second Construction Phase, A Track Elevation Is Required At The Stations Of Line 5904 Nürnberg Ostring, Mögeldorf, Schwaig, And Röthenbach To Enable Ba
Action Deadline
15 Jan 2026
Don't have an account yet?Sign up here.