Contract Awarded For Spgk_neubau Slope Protection Seelenwald U. Randweg Route 4250 Km 59.410-59.650 securing The Slope Consisting Of A Load (approx. 45 ° Inclination) Between The 2nd And 3rd Soul Forest Tunnel With Permanent Flash On The Length Of Approx.
TK ID 515509778
Document Type
Contract Awards
Tender Summary
Contract Awarded For Spgk_neubau Slope Protection Seelenwald U. Randweg Route 4250 Km 59.410-59.650 securing The Slope Consisting Of A Load (approx. 45 ° Inclination) Between The 2nd And 3rd Soul Forest Tunnel With Permanent Flash On The Length Of Approx.
Action Deadline
28 Aug 2025
Don't have an account yet?Sign up here.