PMGSY Tenders WB | West Bengal Government Tenders
West Bengal government tenders
- Industry Machinery


LOCATION SUMMARY DEADLINE
West Bengal Supply Of Main Supply 250nb Float Valve Tag No Sw 79, Main Supply 100nb Float Valve Tag No Pw 17, Commissioning Spares Gasket Sets For 250nb Float Valve Tag No Sw 79, Commissioning Spares Gasket Sets For 100nb Float Valve Tag No Pw 17, Mandatory Spares Co
01 May 2024
West Bengal Supply Of Street Light Panel Range 6 Kw
Supply At Site & Testing Of Street Light Panel Range 6 Kw,1 Phase, Ip 54, Frls, Inbuilt Short Circuit Protection , Class H Insulation Confirms To Is/iec 60947-4-1 ,time Switch Digital 24 Hrs. 32 A Tp Contactor

22 May 2024
West Bengal Supply Of Spare Nozzles
Spare Nozzles For Cutting Blow Pipes- Thickness Of Metal (m.s.) That Can Be Cut: 50 To 100 Mm (1/16)", Is:- 7653/1975 (reaffirmed: Jan-2019). [ Warranty Period: 30 Months After The Date Of Delivery ]

09 May 2024
West Bengal Supply Of Long Term Permanent Catheter Kit Etc.
Long Term Permanent Catheter Kit 14.5 Fr X 23cm. Total Length 40 Cm Kit Contains Catheter Introducer Needle 18g X 7cm. J/straight Guide Wire 12fr X 14fr Dilator 16 Fr Pull Apart Valve Sheath. Tunneling

09 May 2024
West Bengal Supply Of Tan Delta Test Kit With Resonating Inductor (q3) Qty : 1
27 May 2024
West Bengal Supply Of Ratchet Lever Hoist (pull Lift) Capacity 3/4 Tonne (0.8 Tonne), Gearless Hand Operated Machine As Per Rdso Specification No: Ti/spc/ohe/toolpl/1991 Rev-1 Or Latest . [ Warranty Period: 30 Months After The Date Of Delivery ]
21 May 2024
West Bengal Supply Of Borewell Submersible Pump
Supply At Site Testing Of Borewell Submersible Pump Slsw77-09 Of Capacity 1240 Lpm, Head-110 Mtr, Delivery Size - 125 Mm With 40 Hp 2p/2900 Rpm Motor, 415v, 50hz, 3 Phase Along With Suitable Controller/starter And

16 May 2024
West Bengal Supply Of Procurement Of Track Machine Spares.
Hyd Motor Oem : Pl Part No: 62.05.4000.34 Make: Plasser [ Warranty Period: 6 Months After The Date Of Delivery ]

20 May 2024
West Bengal Supply Of Compressor Spares Oil Seal Bush Part
13 May 2024
West Bengal Supply Of 2 Hp Starters
Supply & Testing Of 2 Hp Starters Control Panel For Submersible Pump. [ Warranty Period: 30 Months After The Date Of Delivery ]

23 May 2024