Uttarakhand Tenders | UK Tenders Latest | PMGSY Tenders Uttarakhand
Uttarakhand government tenders
- Water and Sanitation


Traditionally, the public sector in India was assigned a dominant role in planning, development and management of drinking water supply and sanitation projects. Traditionally, the public sector in India was assigned a dominant role in planning, development and management of drinking water supply and sanitation projects. A large number of water and sanitation tender, tender notification, procurement notices, tender news, tenders online, government tender notice, international tenders and public tenders afloat all over India.

LOCATION SUMMARY DEADLINE
Uttarakhand Flood Protection Works Along Right Bank Of Kali River At Army Camp Two Battalion Galati Campus In Block Dharchula District
01 Jun 2024
Uttarakhand Supply Of Stl Tool Carbon Round Bar 55 Mm Dia To Is 6603: 2001, Gr X108cr17mo, Stl Tool Carbon Round Bar 30 Mm Dia To Is 6603: 2001, Gr X108cr17mo Qty : 860
27 May 2024
Uttarakhand Supply Of 7432111049 Axle 14548318102, 7432111069 Screw Plug Olf R And D Bpk 2 235, 7432117003 Ring Bsh8240285, 7432411170 Screw 14548902032 F, 7432411199 Bush 14548220234, 7440208245 Ring U 6001090, 9927090380 Washer 14540000004, 9927090385 Screw 1454890
06 Jun 2024
Uttarakhand Flood Protection Works Along Right Bank Of Kali River At Army Camp Two Battalion Campustalla Haat In Block Dharchula District
01 Jun 2024
Uttarakhand Supply Of W90415303257 Primary Water Pump Centrifugal Type Without Motor, Flow Rate 150m3/hr, Head 77m Spec: Qty : 1
27 May 2024
Uttarakhand Supply Of Hw1202001890 Copper Strip Annealed Spec: Aa12001 Rev: 04 Size: 20x1 5 Dim : Wxt Grade: Cop-etp-a (q3) Qty : 254
20 May 2024
Uttarakhand Repair Maintenance Operation Of Sub-station, Dg Sets, Wet Riser System, Fire Alarm System, Central Heating System, Lifts, Stp And Swimming Pool Installed In Different Office Buildings Of Lbsnaa. (#1 Day-to-day Repair Of Electrical Installation And Replace
Estimated Cost :527895 INR
24 May 2024
Uttarakhand Maintenance Operation Of Electrical Installation I/c Compound Light At Che, Soi. (#1 Comprehensive Annual Maintenance Of Mitsubishi Vrf System At Che, Soi.) .#* Electrical
Estimated Cost :102276 INR
24 May 2024
Uttarakhand Supply Of Hybrid Inverters At Location One, Vrla Gel Batteries At Locatioon One, Photovoltaic Modules At Location One, Acdb Dcdb Array Control Panels With Mcbs Mccbs Fuses Lugs Copper Cable Wire At Location One, Ms Mounting Structure At Location One, Copp
Estimated Cost :3600000 INR
17 Jun 2024
Uttarakhand Supply Of Repair Kit Piston Assy Air Compressor, Kit Pad Assy Front, Body Assy Throttle, Damper Assy Steering, Main Leaf With Bushing Lh, Oil Seal Extension, Rod Assy Steering Drag, Oil Seal, Eng Mounting Pad, Pressure Control Value, Drive Shaft, Vane Pum
07 Jun 2024