Uttar Pradesh Tenders | UP Government Tenders
Uttar Pradesh government tenders
- Transportation Railways


LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of Look Out Glass For End Wall Door Of Lhb Coaches To Rcf Drawing No. Lw56369, Alt. A.
Look Out Glass For End Wall Door Of Lhb Coaches To Rcf Drawing No. Lw56369, Alt. A. [ Warranty Period: 30 Months After The Date Of Delivery ]

14 May 2024
Uttar Pradesh Procurement Of Hindustan Thermometer Make Ignitor Spares At Ntpc Limit Switch,ht-h-ls-gl20,hindusthan, Spare Kit,solenoid Valve,hea Ignitor, Exciter,ht-hea-sc-12j,ht India, Flexible Cable Assy,ht-fca-1012,ht India, Seal Kit,f/igniter Power Cylinder, Hea F
06 May 2024
Uttar Pradesh 5s Implementation Audit And Juse Certification For Ntpc Singrauli By Qcfi Varanasi
03 May 2024
Uttar Pradesh Supply Of Carline Complete (crf)
Carline Complete (crf) For Side Wall Of Lhb Scn (eog) Coach. As Per Planning Set List Number: Mp19clinecrfscn Version 3, Packing Instruction - Mcfpi033 Version 0 (carlines (crf) Items To Be Wrapped In 1 Mm Thick Poly

28 May 2024
Uttar Pradesh Supply Of Part Of Elgi Make 3-phase Memu Motor Coaches.
Air Filter Rr20070of(m), Part No. B005704270002 Make/brand - Elgi Equipment's Limited - Coimbatore (tn) Elgi Part No Applicable. [ Warranty Period: 30 Months After The Date Of Delivery ]kit Gas

09 May 2024
Uttar Pradesh Supply Of Lower Spring Beam
Lower Spring Beam For Ac Coaches To Drg.no.- Wlrrm-0-5-006 Alt- G/0, Col-i (without Bush In Item No.- 6 & 7- Bracket Lh & Rh For Lower Spring Beam And Detailed Icf Drg.no.- Wlrrm-0-5-005 Alt-f/0, Specification No.- Is: 20

10 May 2024
Uttar Pradesh Providing Of Manpower Outsourcing Services - Minimum Wage - Skilled; Others; Electrician, Manpower Outsourcing Services - Minimum Wage - Unskilled; Others; Office Boy Qty : 2
Estimated Cost :467608 INR
06 May 2024
Uttar Pradesh Supply Of Spindle For Hand Brake For Boxn Wagon To Rdso Drg. No. Wd-80007-s-19, Item No.1, Alt.18
Spindle For Hand Brake For Boxn Wagon To Rdso Drg. No. Wd-80007-s-19, Item No.1, Alt.18 [ Warranty Period: 30 Months After The Date Of Delivery ]

20 May 2024
Uttar Pradesh Fabrication, Supplying, Assembling/erection And Launching Of 45.7 M Open Web Girders (25t. Loading) Including Fabrication, Supply And Fixing Of H-beam Sleepers And Rocker & Roller Bearings For Br.no. 1a(2x45.7 M.) Between Nanpara -nepalganj Section Of Bah
Estimated Cost :68431746 INR
21 May 2024
Uttar Pradesh Supply Of Set Of Ducting Assly For Wap-5 Locomotive.
Set Of Ducting Assly For Wap-5 Locomotive As Per Clw Specn. No. Clw/ms/3/048 Alt-6. [ Warranty Period: 30 Months After The Date Of Delivery ]

07 May 2024