Uttar Pradesh Supply Of Set Of Over Current Relay Qf/qe Di Type. One Set Consisting Of 02 Items, 02 Nos. (i) Di- Qf- Aal Pt.no. Ka210013r0016 Complete Relay Assly. - 01 No. (ii) Di-qe- Aal Pt.no. Ka210013r0015 Complete Relay Assly.- 01 No
Set Of Over Current Rela

19 Jun 2024
Uttar Pradesh Supply Of Voltage Phase Control (mmr- Measuring And Monitoring Relay) .
Voltage Phase Control (mmr- Measuring And Monitoring Relay) Net-1 And Net-2, 3ac, 1000v Auxiliary Voltage 110v Ac/dc Conforming To Rdso Spec No. Rdso/pe/spec/ac/0184-2015 (rev-1

28 May 2024
Uttar Pradesh Supply Of Different Types Of Material Under Deposit Scheme – Alluminium Lugs, Copper, Lt Clamp, Nut Bolt, Etc.
29 May 2024
Uttar Pradesh Interior Furnishing , Electrical & Data Work For Branch At Kuadanda Branch, Faridpur.
11 Jun 2024
Uttar Pradesh Supply Of Cctv Dome Camera, Cctv Bullet Camera, Dvr 16 Channel, Dvr 04 Channel, Ups For Dvr, 20 Inch Monitor For Display - As Per Boq Qty : 65
22 May 2024
Uttar Pradesh Quantum Of Work Involved In Replacement Of Jarjar/damaged 11 Kv Xlpe Cable, Lt Ab Cable, Battery Charger And Battery Set, Under Edsd-i Shuklaganj Edd-ii Unnao Against Business Plan 2024-25 Part-1
Estimated Cost :480000 INR
30 May 2024
Uttar Pradesh Supply Of Protective Cap Along With Breather Plug As Per Attached Drg.no.g/sd3-1305. [ Warranty Period: 30 Months After The Date Of Delivery ]
04 Jun 2024
Uttar Pradesh Supply Of Thermocouple For New Reactors, Heating Tape Max Temp 300 C, Solenoid Operate On Off Valve Ss 42, Ball Valve Ss42 Gs4, Needle Valve Ss1vs4, Panel On Off Push Button, Ss Tube Fittings Ss 400 3, Ss Tube Fittings Ss 400 6, Ss Tube Fittings Ss 400 9,
04 Jun 2024
Uttar Pradesh Supply Of Led Luminaire (for Road Street Lights) As Per Is 10322, Is 16107, Is 16108, Is 16103, Is 10322 (q3) Qty : 10
31 May 2024
Uttar Pradesh Works Of Carriage Of 40 Mva Transformers & Other Associated Works For Increasing Capacity At 132 Kv Substations Under Etd.
Estimated Cost :518421 INR