Uttar Pradesh Tenders | UP Government Tenders
Uttar Pradesh government tenders
- Water and Sanitation


Traditionally, the public sector in India was assigned a dominant role in planning, development and management of drinking water supply and sanitation projects. Traditionally, the public sector in India was assigned a dominant role in planning, development and management of drinking water supply and sanitation projects. A large number of water and sanitation tender, tender notification, procurement notices, tender news, tenders online, government tender notice, international tenders and public tenders afloat all over India.

LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of Electronic Avr, Mounting Pad, Dg Controller 6600, V Belt, Dg Controller 541 - Ord Stores Qty : 14
20 May 2024
Uttar Pradesh Supply Of Fevicol Adhesive, Welding Holder, H Cutter Blade 7 Inch Diamond, Randa Machine Cutter Blade 13 Inch, Panna No 21 23, Panna No 14 15, Chabi No 14 15, Aara Machine Gutke, Stud Aara Machine 3 Half Soot, Welding Screen, Welding Machine Lead Copper,
20 May 2024
Uttar Pradesh Repair / Replacement And Maintenance Of Central Ac Plants At Afmsd , 25weu, Receiver Stn , Surya Auditorium, Signal Centre, Transmitter Station And Ops Room Complex In The Area Of Age E/m Ext (ws) Under Ge E/m
Estimated Cost :9000000 INR
25 May 2024
Uttar Pradesh Supply Of Bearing 6201 For Ceiling Fan, Bearing 6202 For Ceiling Fan, Bell Push 6 Amp, Call Bell Ding Dong, Cable Pvc Copper Sc 1 5 Sqmm, Cable Pvc Copper Sc 2 5 Sqmm, Cable Pvc Copper Sc 4 Sqmm, Cable Pvc Copper Sc 6 Sqmm, Cable Pvc Copper Insulated Mult
01 May 2024
Uttar Pradesh Handling Work For Wheat Purchase 2024-25 At Centre Atrauliya Farmers Producer Company Limited (affiliated With Fcs).
04 May 2024
Uttar Pradesh Repair Overhauling Service - Repair Of Maintenance Stand; Repair Of Maintenance Stand; Yes; Buyer Premises Qty : 18
Estimated Cost :395300 INR
07 May 2024
Uttar Pradesh Supply of Split Air Conditioner Including Green AC, Wall Mount Type (Q2). Qty : 19
03 May 2024
Uttar Pradesh Construction of Switch Gear Control Room Building, Retaining/boundary Wall, Switch Yard Fencing, Road (approach & Internal), Gate, Tubewell Boring & Other Associated Civil Works at 33/11 Kv Sub Station New Pagal Baba District.
02 May 2024
Uttar Pradesh Supply Of Roof Ventilator Arrangement
Roof Ventilator Arrangement As Per Drg No Lg16133 Alt 'b' Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ]

17 May 2024
Uttar Pradesh Supply Of Piston Std, Ring Set Piston Std, Bearing Set Crank Thrust, Bearing Set Crank Shaft, Gasket Cylinder Head Cover, Gasket Intake Manifold, Valve Intake, Valve Exhaust, Bearing Set Connecting Rod - Mt Stores Qty : 21
Estimated Cost :50000 INR
20 May 2024