Tamil Nadu Tenders | Tamilnadu Tenders | TN Govt Tenders
Tamilnadu government tenders
- Energy%2C Power and Electrical


LOCATION SUMMARY DEADLINE
Tamilnadu Supply Of 110v/20amps Smr Module
Supply Of 1 Kva Transformer Module As Per Rdso Specification No. Rdso/spn/165/2012 Version 3.0 Suitable For Statcon Make Ips [ Warranty Period: 30 Months After The Date Of Delivery ]supply Of Inverter Module 2 Kva As

03 Jun 2024
Tamilnadu Supply, Erection And Commissioning Of Vvvf Drive Atv310hu 15n4e, 1.5kw/2hp, 4.1a With Ethernet Vari And Line Choke, Make : Schneider / Cfl / Abb. [ Warranty Period: 12 Months After The Date Of Delivery.
30 May 2024
Tamilnadu Auction Sale Of Engineering Items: Spare Parts (accessories For Burner Hydraulic Lance), Spare Parts (nozzle), Spare Parts (safety Solenoid Valve), Spare Parts (ignition Transformer), Spare Parts (actuation Oil Solenoid Valve No Parker (110 Vac), Spare Pa
16 May 2024
Tamilnadu Supply Of Set Of Locking Plate For Hitachi Traction Motor
Set Of Locking Plate For Hitachi Traction Motor Consisting Of 2 Items. (1) Pinion Locking Plate As Per Drg No Trs/acl/p/ 545 - 2 Nos/set (2) Triangular Lock Plate For Hitachi Tm As Per Drg No

07 Jun 2024
Tamilnadu Supply Of Hrc Fuse As Per Is 13703 (q3)
Qty : 5800

13 May 2024
Tamilnadu Construction Of Running Room At Puduchattiram Station Yard.
Estimated Cost :19091954 INR
03 Jun 2024
Tamilnadu Electrical Maintenance Works Of Lt Installations In Essential Staff/cisf Quarters At Iprc.
Estimated Cost :1157000 INR
27 May 2024
Tamilnadu Provision of Independent 11 Kv Ht Electric Power Supply to Cda Chennai Complex Under Ge
Estimated Cost :6200000
17 May 2024
Tamilnadu Supply of Cat6a Ethernet Cable - Shielded Foiled Twisted 4 Pair, Supply of Flexible Armored 12 Core Fiber Optic Cable, Supply of 48 Port Managed Non-poe Switch - 48nos of 10 - 100 - 1000 Mbps Copper Ports 4 Nos of 10gbps Sfp Ports, Supply of 2 Core Lc 10gbps Sfp Optical Transreceiver, Supply of 12po
17 May 2024
Tamilnadu Supply Of Cable Jacket System
Cable Jacket System To Rcf Specn. Edts-138,rev-0,corr.1,item-7. [ Warranty Period: 30 Months After The Date Of Delivery ]

22 May 2024