Rajasthan Tenders | Rajasthan Govt Tenders | Tenderskhoj
Rajasthan government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Rajasthan Replacement Old Rcc/stone Slab With Rcc Box/slab At Bridge No: 256up, 257up, 274up, 287up, 292up, 302up, 303up & 316up Under The Jurisdiction Of Aden-swm.
Estimated Cost :28043676 INR
07 Jun 2024
Rajasthan Construction Of Rubs Of Size 4.50m X 4.50m On Tresspassing Location At Km 230/3-4 And In- Lieu Of Lc No. 113 At Km 174/0-1 In Suratgarh-lalgarh Section Using Cut And Cover Method Under Control Of Aden/suratgarh.
Estimated Cost :136604116 INR
11 Jun 2024
Rajasthan Nagda-kota Section: Construction Of 2-lane Road Over Bridge (rob) On Cost Sharing Basis In Lieu Of Lc No: 40 (tvu=161616) At Km: 772/20-22 Between Nkh-sva Stations.
Estimated Cost :113106098 INR
31 May 2024
Rajasthan Supply Of Bridge Arm Assembly (specification As Pe
Bridge Arm Assembly (specification As Per Attached Annexure) [ Warranty Period: 30 Months Afterthe Date Of Delivery ]

29 May 2024
Rajasthan Construction Of Box Culvert Near On Chauli Link Canal Near Village Sarangakhera.
Estimated Cost :2937000 INR
23 May 2024
Rajasthan Earth Work In Bank/cutting Including Blanketing, Construction Of Minor Bridges, Rub/lhs, Fob, Trolley Refuges, Toe Wall, Retaining Wall, Pitching, Station Buildings And Other Structures, Platform, Platform Sheds, Staff Quarters And Other Ancillary Works F
Estimated Cost :2924763768 INR
14 Jun 2024
Rajasthan Construction Of Box Culvert Near On Chauli Link Canal Near Village Sarangakhera.
Estimated Cost :2937000
23 May 2024
Rajasthan Construction Of Balance Works (bow String Type Girders Plus Composite Type Girders Plus Psc Girder In Railway Portion From Rob Chainage 1.666 To Chainage 1.871 Total Lenght 205 M At Km 30.00 On Nh 162e Pali Nadol Section Crossing Falna Marwar Railway
Estimated Cost :481200000
20 Jun 2024
Rajasthan Ohe Work In Connection With Construction Of 2 Lane Rob (12 Nos) At Lc No: 127, 216, 126, 173, 118, 217, 113, 200, 141x, 148, 175 & 128 In Nad-mtj Section Of Division.
Estimated Cost :5706348 INR
28 May 2024
Rajasthan Zone-iv: Bridges Of 2024-2025 For Schedule Maintenance And Minor Repair Of Various Bridges And Rob's Under Jurisdiction Of Sse/br/kota In Kota-nad And Rma-brrg Line Section Of Division.
Estimated Cost :5185932 INR
28 May 2024