Punjab Tenders | PWD Punjab Tenders | Punjab and Sind Bank Tenders
Punjab government tenders
- Transportation Ports%2CWaterways and Shipping


LOCATION SUMMARY DEADLINE
Punjab Supply, Installation, Testing And Commissioning Of Inclinometer For Eot Crane In Rcf .
Estimated Cost :2132684 INR
20 May 2024
Punjab Supply Of Spare Parts Required For Maintenance Of Hyd.road Mobile Crane Cap.20 Ton Make Til.
Parking Brake Assembly For Hyd. Road Mobile Crane Make Til Cap. 20 Ton Conforming To Part No. W7926000412 [ Warranty Period: 12 Months After The Date Of Del

08 May 2024
Punjab Supply Of Louvre Frame
Louvre Frame, As Per Drawing: Vp14214 Alt. 'nil', Packing Instruction: Packing Instructions For Louvre Frame Arrangement 1. The Packing/fixture/pallet To Be Made Using Wooden Cage Which Should Have Sufficient Strength To Bear

10 Jun 2024
Punjab Design, Manufacture, Erection, Supply, Installation And Commissioning Of Eot Crane Cap-20 Ton As Per Specification No. Mech/m&p/3800/03 Rev-04. [ Warranty Period: 30 Months After The Date Of Delivery ]
06 May 2024
Punjab Supply Of Eot Crane, Capacity-05 Ton
Eot Crane, Capacity-05 Ton As Per Asrw Specifications (bid Document Par-ii) Including Maintenance Spares As Per Schedule-iv, Maintenance Tools As Per Schedule-v And Leading Parameter Of Crane & Additional Spares

21 May 2024
Punjab Maintenance Of Eot Cranes Track, Rolling Shutters And Miscellaneous Works In Workshop Area For The Year 2024-25.
Estimated Cost :2345409 INR
17 May 2024
Punjab Supply Of Eot Crane, Capacity-10 Ton
Eot Crane, Capacity-10 Ton As Per Asrw Specifications (bid Document Par-ii) Including Maintenance Spares As Per Schedule-iv, Maintenance Tools As Per Schedule-v And Leading Parameter Of Crane & Additional Spares

20 May 2024
Punjab Supply Of Spares For 3t Eot Crane 2t Cantilever Crane Avi Make
Complete Hook Assembly For 9 Mm Wire Rope For Eot Crane 3 Ton Make Avi [ Warranty Period: 30 Months After The Date Of Delivery ]complete Electro Magnetic Hoist Brake Assembly For 3 Ton E

07 May 2024
Punjab Supply of spares required for 20t eot crane
half gear coupling no-102 drg:eot crane [ warranty period: 30 months after the date of delivery ]lt motor pinion for 20t crane drg:drg.no.rcf/mh/eot/84 [ warranty period: 30 months after the date of delivery ]intermediate gear for lt gear box for 20t

29 Apr 2024
Punjab Supply Of Set Of Console
Set Of Console, As Per Drawing: Mplconsolelhb Version 2, Packing Instruction: Packing Instructions For Set Of Console 1. The Packing/fixture/pallet To Be Made Using Wood Should Have Sufficient Strength To Bear Approximate We

28 May 2024