Orissa Tenders | PMGSY Tenders Odisha | Tenders Orissa PWD
Odisha government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Odisha Part Design And Construction Of Elevated Viaduct And Six Elevated (excluding Architectural Finishing ) From Chainage 625.00 M To 7747.00 M Of Bhubaneswar Metro Phase-i Mrts.
Estimated Cost :6306500000
07 Jun 2024
Odisha Through Bridge Channel Sleeper Renewal Of Existing 851 Nos. Channel Sleepers With New "h' Beam Sleepers Over Br. No. 392 (up & Dn) And Br. No 434dn Between Bhadrak - Jakhapura Section Of Khurda Road Division.
Estimated Cost :26831620 INR
31 May 2024
Odisha Zonal Contract (bridge Works) For Hds-prdp Section Under The Jurisdiction Of Sse(bridge)/ctc-ii Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :5668307 INR
31 May 2024
Odisha Zonal Contract (bridge Works) Under The Jurisdiction Of Sse(bridge)/north & South Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :12003870 INR
31 May 2024
Odisha Zonal Contract (bridge Works) Under The Jurisdiction Of Sr. Section Engineer (bridge)/cuttack-i And Cuttack-ii Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :12584856 INR
31 May 2024
Odisha Zonal Contract (bridge Works) Under The Jurisdiction Of Sse(bridge)/bhc & Kdjr Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :11016908 INR
31 May 2024
Odisha Part Design And Construction Of Elevated Viaduct And Seven Elevated Stations Viz. Jayadev Vihar Square, Xavier Square, Rail Sadan, District Centre, Damana Square, Patia Square And Kiit Square (excluding Architectural Finishing) From Chainage 7747.00
05 Jun 2024
Odisha Part Design And Construction Of Elevated Viaduct And Six Elevated Stations (excluding Architectural Finishing ) From Chainage 15017.00m To 25987.78m And Including Ramp For Depot Entry Of Bhubaneswar Metro Phase-i Mrts.
Estimated Cost :8697100000
05 Jun 2024
Odisha Sprinkler System Extension At Rayagada Lpg Plant Erw Pipe 3" 50 Meter, 2 Erw Pipeline 2" 60 Meter, 3 Erw Pipeline 1" 60 Meter, 4 Fabrication & Erection 1" To 2" 120 Running Meter, 5 Fabrication & Erection 3" 40 Running Meter, 6 Mv Spray Nozzle 120 Each
13 May 2024
Odisha Part Design And Construction Of Elevated Viaduct And Seven Elevated Stations (excluding Architectural Finishing ) From Chainage 7747.00 To 15017.00 Of Bhubaneswar Metro Phase-i Mrts.
Estimated Cost :6640600000
05 Jun 2024