Nagaland Tenders | NHM Nagaland Tender | NIT Nagaland Tenders
Nagaland government tenders
- Infrastructure Roads and Highways


LOCATION SUMMARY DEADLINE
Nagaland Rfp For Consultancy Services For Preparation Of Detailed Project Report For Slope Protection And Slope Stabilization Works Including Rock-fall Protection And Landslide Mitigation Measures From Km 123.840 To Km 166.700 Of Nh-29 On 4-laning Of Dimapur-kohim
23 May 2024
Nagaland Rfp For Short Term Maintenance Contract Of Peren - Dimapur Section On Nh-129a From Existing Km 120.500 To Km 123.380 Design Km 120.320 To Km 123.200 Length 2.88 Km In The State Of Nagaland In Fy 2024-25 Percentage Rate And Work Order Basis 2nd Call.
24 May 2024
Nagaland Rfp For Balance Work Four-laning From Km. 123.840 To Km. 138.775 (existing Km 124.100 To 140.000) Excluding Dimapur & Kohima Bypass In The State Of Nagaland On Item Rate & Work Order Basis At The Risk & Cost Of Epc Contractor.
28 May 2024
Nagaland Construction & Upgradation Of Road From Tokiye To Satoi Road Via Khewoto-hoshepu Eac Hq. Khekiye Health Sub-centre And Nihoshe Hydro Project (tokiye Eac Hq To Khekiye, Phase-i) Length=12.00 Km Scheme Of Central Road And Infrastructure Fund (crif).
Estimated Cost :239149000 INR
27 Jun 2024
Nagaland Consultancy Services For Preparation Of Dpr For Study Of Landslide Area On Various Locations Between Chainage Km 172.900 To Km 182.000 Along Nh-39 (new Nh-29) In The State Of Nagaland
07 Jun 2024
Nagaland construction Of Bailey Bridge At Teza Between Pwd Road Tehok Junction To Mini Hydro Project Under Setu-bandhan Scheme Of Central Road And Infrastructure Fund (crif) 2023-24. (job No. Setu-bandhan/2023-24/02).
Estimated Cost :35821000 INR
22 Jun 2024
Nagaland Development Of New A Site Ksk At Location Between Jharnapani And Punglwa Road On Rhs Within 4 Kms With Nh 29 Nagaland
Estimated Cost :13068208 INR
21 May 2024
Nagaland Consultancy Services For Preparation Of Dpr For Study Of Landslide Area On Various Locations Between Chainage Km 172.900 To Km 182.000 Along Nh-39 (new Nh-29) In The State Of Nagaland
07 Jun 2024
Nagaland Balance Work Four-laning From Km. 123.840 To Km. 138.775 Existing Km 124.100 To 140.000 Excluding Dimapur And Kohima Bypass In The State Of Nagaland On Item Rate And Work Order Basis At The Risk And Cost Of Epc Contractor
Estimated Cost :58406963 INR
28 May 2024
Nagaland Rfp For Consultancy Services For Authority’s Engineer For Supervision Of I) Construction Of 2 Laning With Hard Shoulder Of Peren – Dimapur Section On Nh – 129a From Design Km 146.208 To Km 163.592 (length – 17.384 Km) In The State Of Nagaland On Epc Mode
26 Dec 2024
Showing : 10