Mizoram Tenders | Live Tender in Mizoram | Tenderskhoj
Mizoram government tenders
- Infrastructure and construction


Infrastructure Industry in India have been experiencing a rapid growth in its different sectors. The construction industry accounts for around one-tenth of the worlds gross domestic product, seven percent of employment, half of all resource usage and up to 40 percent of energy consumption. There is huge demand for Infrastructure and construction development projects all over India. A large number of construction industry tenders, public tender notices, procurement notices, bid invitation,Construction government tenders, international tenders, ICBs, tender notification and contracts afloat worldwide.

LOCATION SUMMARY DEADLINE
Mizoram Protection Work Of Slope Failure At Ch. 30.600 - 30.700, Provision Of Cable Anchor At Ch.25.338 Near Portal-1 Of Tunnel No. T/12a, Construction Of Retaining Wall On Pile Foundation And Counterfort Wall At Sang Yard In Between Ch. 49.630 To Ch. 49.875, Ear
Estimated Cost :435195873 INR
12 Jun 2024
Mizoram Protection Work Of Slope Failure At Ch. 30.600 - 30.700, Provision Of Cable Anchor At Ch.25.338 Near Portal-1 Of Tunnel No. T/12a, Construction Of Retaining Wall On Pile Foundation And Counterfort Wall At Sang Yard In Between Ch. 49.630 To Ch. 49.875, Ear
Estimated Cost :435195873 INR
12 Jun 2024
Mizoram Design And Construction Of 282.00 Mtr Span Balance Cantilever Psc Box Girder Bridge Over River Chimtuipui Including Approaches At Km 6.490 On Road Hnathial - Sangau - Saiha Under 71 Rcc/24 Brtf/ Project Pushpak In Mizoram State Through Epc Mode
01 Jul 2024
Mizoram Construction Of Residential Staff Quarters For Office Of The Accountant General At Chawnpui, Mizoram. #1 Construction Of 60 Nos Type-iii Quarters Including Retaining Wall Works. (#1 Providing Services Of Inspection Vehicle On Hire Basis For Aizawl Central
24 May 2024
Mizoram Construction Of Residential Staff Quarters For Office Of The Accountant General At Chawnpui And Mizoram. #1 Construction Of 60 Nos Type-iii Quarters Including Retaining Wall Works. (#1 Providing Services Of Security Guards And Sweeper For The Divisional O
Estimated Cost :468376 INR
24 May 2024
Mizoram Providing And Laying Of Hmp Ready Mix Bc 30 Mm Th Incl Cleaning Rd Surface Applying Tack Coat, Correction Wks With Bm 75 Mm Incl Rd Marking For Re-surf Wks On Various Loc Bet Km 12.45 To Km 37.50 (net Length 17.050 Km) On K-v-k Rd Under 74 Rcc Project Psk
03 Jun 2024
Mizoram Construction Of Twin Tube Uni-directional Aizawl Bypass Tunnel Of 2.5 Km And Its Approaches Of 2.1 Km From Km 10.600 To Km 15.200 (package-2) On Sairang - Phaibawk Section Of Nh-6 In The State Of Mizoram On Epc Mode.).
11 Nov 2024
Showing : 7