Meghalaya Tenders | PMGSY Tenders Meghalaya
Meghalaya government tenders
- Water and Sanitation


Traditionally, the public sector in India was assigned a dominant role in planning, development and management of drinking water supply and sanitation projects. Traditionally, the public sector in India was assigned a dominant role in planning, development and management of drinking water supply and sanitation projects. A large number of water and sanitation tender, tender notification, procurement notices, tender news, tenders online, government tender notice, international tenders and public tenders afloat all over India.

LOCATION SUMMARY DEADLINE
Meghalaya Supply Of Split Air Conditioner Including Green Ac, Wall Mount Type (q2) Qty : 8
20 May 2024
Meghalaya Supply Of Split Ac 1tr Only Cooling, Dehumidifier 30 Ltrs, Copper Pipe Half Size 0 8mm Thickness With All Fittings, Copper Pipe One Forth Size 0 8mm Thickness With All Fittings, Nitrile Insulation 13mm Tube For Copper Pipe, Multi Str Cable For Communicati
Estimated Cost :214050 INR
31 May 2024
Meghalaya Rehabilitation, Improvement Of Basic Facilities Of Umiam Stage-i Dam In Ri-bhoi District Of Meghalaya Under Drip-ii (package-iii).
Rehabilitation, Improvement Of Dykes And Basic Facilities.

10 Jun 2024
Meghalaya Design, Supply, Construction And Operation And Maintenance Of Passenger Ropeway At Shillong Peak, Shillong, Meghalaya, India.
Design Supply Construction And Operation And Maintenance Of Passenger Ropeway At Shillong Peak Meghalaya India

Estimated Cost :1520300000
23 May 2024
Meghalaya 10/east Jaintia Hills/2024 & Construction Of Water Harvesting Structures Lot- 1 And Lot-2 At East Jaintia Hills, Meghalaya (the Works).
24 May 2024
Meghalaya Construction Of Water Harvesting Structures Whs (ewkh).
13 May 2024
Meghalaya Repair Or Replacement And Amc Of Water Supply Automation System And Allied Works At Hq Eac (u) Af Under Ge (i) (af)
Estimated Cost :2000000 INR
30 May 2024
Meghalaya Construction Of Whs
Construction Of Whs (west Jaintia Hills)

13 May 2024
Meghalaya Construction Of Water Harvesting Structures (wkh)
13 May 2024
Meghalaya Supply Of Socket 16 Amp Modular Maru, Switch 16 Amp Modular Maru, Modular Plate 3 Module, Modular Plate 4 Module, Hammer 340 Gm Machinist, Hammer 400 Gm Machinist, Hammer 200 Gm Machinist, Hammer Sledge 1 5 Kg, Socket 6 Amp Flash Type, Switch 6 Amp Flash
Estimated Cost :1387109 INR
30 May 2024