Maharashtra Tenders | Maharashtra Government Tenders
Maharashtra government tenders
- Energy %26 Power Non Renewable Energy


LOCATION SUMMARY DEADLINE
Maharashtra Supply Of Roof Top On Grid Solar Plant At Igp, Ceti Hostel Thk, G+5 Building Pnvl And Thane Running Room.
24 May 2024
Maharashtra Proposal For Setting Up Roof Top Solar Power Generation System At Vip Rest House And Prakash Parv 400kv Control Room Buildings At 400kv Rs(o&m)dn, Padghe Under Hvdc Rs(o&m)circle.
01 May 2024
Maharashtra Design, Manufacture, Supply, Installation, Testing, Commissioning With Remote Monitoring System 160 Kw Capacity Grid Connected Solar Pv Power Plant Ground Mounted Net Metering System At Water Treatment Plant Dhoki, Tq. Dist. For Dhoki And 4
Estimated Cost :10193751 INR
01 May 2024
Maharashtra Harnessing Of Solar Energy On Rooftop Of Buildings By Provisioning Of 1mwp Solar Rooftop Power Plant Under The Public Private Partnership(ppp) Model In Matunga Workshop.
08 May 2024
Maharashtra Design Engineering Supply Installation Testing Commissioning and Comprehensive Operation and Maintenance of Roof Top Solar PV Project and associated support structure works on RESCO Model for a Period of 25 Years of Mumbai Metro Line 3 Project
16 May 2024
Maharashtra Provision Of Roof Top On Grid Solar Plant At Igp, Ceti Hostel Thk, G+5 Building Pnvl And Thane Running Room In Mumbai Division.
Estimated Cost :22376110 INR
24 May 2024
Maharashtra Balance Of System Package Including Power Evacuation And Three (03) Years Comprehensive Operation & Maintenance For Cumulative Capacity Of 400 Mw (ac) (msedcl Phase-vii & Phase-ix) Solar Photovoltaic Power Project(s) At Four Different Locations In Maharas
14 May 2024
Maharashtra Dismantling Shifting And Recommissioning Of 200kwp Rooftop Solar Power Plant At Wip Building At Barc Trombay
Estimated Cost :970000 INR
14 May 2024
Maharashtra Balance Of System Package Including Power Evacuation And Three (03) Years Comprehensive Operation & Maintenance For Cumulative Capacity Of 400 Mw (ac) (msedcl Phase Vii & Phase-ix) Solar Photovoltaic Power Project(s) At Four Different.
14 May 2024
Maharashtra Harnessing Of Solar Energy On Rooftop Of Buildings By Provisioning Of 1mwp Solar Rooftop Power Plant Under The Public Private Partnership(ppp) Model In Matunga Workshop
07 Jun 2024