Karnataka Tenders | Pwd Tenders in Karnataka
Karnataka government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Karnataka Proposed Construction Of Rcc Drain In Connection With The Work Of "through Ballast Recoupment Of Points And Crossings - 6 Points In Dodbele (dbl) Yard And 4 Points In Hirehalli (hhl) Yard (total 10 Nos., )". Sw Ii : Bengaluru - Sampige Road Sec : Construc
Estimated Cost :27325081 INR
06 Jun 2024
Karnataka Repairs To Drains And Culverts At 58su Af Station Chimney Hills.
Estimated Cost :750000 INR
31 May 2024
Karnataka Attention Of Weak Formation At Padi Tunnel At Km 46418-465/0 Under Aen/mao Section Of Krcl
Estimated Cost :2745187 INR
29 May 2024
Karnataka Replacement Of Steel Girder For Bridge No. 422 At Km 0/800-900 (b-line And Shunting Neck) Between Bengaluru (sbc) - Yesvanthpur (ypr) Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later
Estimated Cost :26117051 INR
06 Jun 2024
Karnataka Providing Side Pathway For Steel Girder Bridges In Bangalore Division (64 Bridges-135 Spans). Maintenance Period 2 Months
Estimated Cost :34205566 INR
06 Jun 2024
Karnataka Digging Of Sand/excavation In Tottampali Steelway Poli Moth South Division And Transportaiotn To M/s Irel(india) Limited Chavara And M/s., Kmml, Shankaramangalam. # Kannada_image.
31 May 2024
Karnataka Repairs Of Ballastless Track Under Traffic In Barcem And Karwar Tunnels In Karwar Region Of Konkan Railway
Estimated Cost :4236944 INR
29 May 2024
Karnataka Rrb-tlgp Section: Improvement To Bridges (76 Nos.) In Aden/smet Sub-division.
Estimated Cost :10200837 INR
31 May 2024
Karnataka Proposed Construction Of Foot Over Bridge (3m Wide) Of Clear Span 1 X 11.33m With Staircase Facility At Km: 104/100 Between Mvc-has Stations To Eliminate Unauthorized Crossing.
Estimated Cost :14495908 INR
27 May 2024
Karnataka Strengthening Of Bridges From Km.40.000 To Km.86.400 By Providing Pitching, Flooring, Drop Wall, Steps, , Ballast Retainer Etc (total 80 No. Of Bridges) Mys-y Section: Ancilliary Works To Wing Wall, Retaining Wall, Side Drain And Approach Road At Sw-ii:-l
Estimated Cost :27089762 INR
27 May 2024