Karnataka Tenders | Pwd Tenders in Karnataka
Karnataka government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Karnataka Re Construction Of 4 Lane Major Bridge At Km 173.600 Across Lakshmanathirtha River Along With Approaches From Km 171.300 To 176.400 In Hunsur Town Limits On Nh 275 Bantwal Mysore Section In The State Of Karnataka
Estimated Cost :759900000
05 Jun 2024
Karnataka Proposed Construction Of Foot Over Bridge (3m Wide) Of Clear Span 1 X 11.33m With Staircase Facility At Km: 104/100 Between Mvc-has Stations To Eliminate Unauthorized Crossing.
Estimated Cost :14495908 INR
27 May 2024
Karnataka Strengthening Of Bridges From Km.40.000 To Km.86.400 By Providing Pitching, Flooring, Drop Wall, Steps, , Ballast Retainer Etc (total 80 No. Of Bridges) Mys-y Section: Ancilliary Works To Wing Wall, Retaining Wall, Side Drain And Approach Road At Sw-ii:-l
Estimated Cost :27089762 INR
27 May 2024
Karnataka Hubballi Division: Improvement To Returning Wall /parapet Wall/ballast Retaining Wall And Grounting Of The Bridge No-10 In Hubli-gadag Section Under Aden/central/ubl Jurisdiction. (maintenance Period = 04months)
Estimated Cost :17647395 INR
24 May 2024
Karnataka Cleaning And Deepening Of Borewell Near Neharu Road Takies Opposite In Tp Nyamathi
Estimated Cost :100000 INR
10 May 2024
Karnataka Conversion Of Mechanical Weigh Bridge To Electronic Weigh Bridge At Barc Mysuru.
Estimated Cost :490000 INR
15 May 2024
Karnataka Construction of Rub in Lieu of Lc No 1 Mysore Chamarajanagra Railway Lane Near Kukkarahalli Lake in Mysore City Corporation Limit Mysore
Estimated Cost :364635086
05 Jun 2024
Karnataka Construction of Rob in Lieu of Lc No 51 Bengalure Mysore Railway Lane Near Byrapatna of
Road Connecting Bm Road at Byrapatna Via Devarahalli in Channapatna Taluk Ramanagara District

Estimated Cost :357443856
05 Jun 2024
Karnataka Construction of Rub in Lieu of Lc No 5 at Km 5 60 of Mdr Road Mysuru Belagola Road in Mysore Taluk Mysore District
Estimated Cost :372573845
05 Jun 2024
Karnataka Maintenance Works From Tunnel Exit-10km Chainage To 18km Chainage In Kiocl Pipeline Corridor, Kiocl Limited, Nooralbettu.
13 May 2024