Karnataka Tenders | Pwd Tenders in Karnataka
Karnataka government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Karnataka Repair Of 09 Numbers Of Krupp Mann Bridge Girder Assembly, Replacement Of 04 Nos Strap, Replacement Of 04 Nos Bushing, Replacement Of 08 Nos Pin 41mm Dia X 90mm Length, Replacement Of 04 Nos Pin For Locking, Replacement Of 08 Nos Pin Dowel, Replacement Of
11 Jun 2024
Karnataka Repair, Replacement, Maintenance 01 Number Of Aluminium Baut Of Bridge Floating Heavy, Customized Aluminium Sheet With Channel Design With The Help Of Die Power Press, Leak Proof Aluminium Tig Welding To Be Done, Pasting Of Water Proof Sealant Tube On All
11 Jun 2024
Karnataka Repair Of 06 Numbers Of Cross Girder Of Bridge Floating Heavy, Replacement Of 32 Nos Barrel, Replacement Of 32 Nos Eccentric Locking Nut, Replacement Of 32 Nos Dowel Pin 10mm, Replacement Of 32 Nos Dowel Pin 6mm, Replacement Of 32 Nos Eccentric Bolt, Repl
11 Jun 2024
Karnataka Repair Of 09 Numbers Of Km Floating Bridge Girder Assembly, Replacement Of 04 Nos Ms Bracket Pin Assembly Holder, Replacement Of 04 Nos Ms Sleeve Bush, Replacement Of 08 Nos Steel Pin, Replacement Of 04 Nos Steel Locking Pin, Replacement Of 08 Nos Steel D
11 Jun 2024
Karnataka Repair Of 06 Nos Of Cross Girder Assembly Of Pontoon Bridge, Complete Assembly To Be Cleaned, Complete Assembly To Be Acid Washed The Body Threads To Be Re Cleaned With Precision Thread Tape Gauge Bolt To Be Re-assembly Refitted In Each Girder, Highly Ano
11 Jun 2024
Karnataka Attention Of Weak Formation At Padi Tunnel At Km 46418-465/0 Under Aen/mao Section Of Krcl
Estimated Cost :2745187 INR
03 Jun 2024
Karnataka Elimination Of Lc No. 203 At Km 329/400-500 Between Dvg-avc And Lc No. 64 At Km 126/300-400 Between Avc-tlgi Stations By Construction Of Subway.
Estimated Cost :1652254 INR
10 Jun 2024
Karnataka Construction Of Quarters And Service Buildings, Dismantling Of The Structures And Earth In Formation For Embankment And Cutting Including Extensions Of Bridges, Retaining Walls And Allied Works, Electrical Works And Telecom Works(phase-1 Development Of My
Estimated Cost :2147000000 INR
05 Jul 2024
Karnataka Providing Side Pathway For Steel Girder Bridges In Bangalore Division (64 Bridges-135 Spans). Maintenance Period 2 Months
Estimated Cost :34205566 INR
06 Jun 2024
Karnataka Proposed Construction Of Rcc Drain In Connection With The Work Of "through Ballast Recoupment Of Points And Crossings - 6 Points In Dodbele (dbl) Yard And 4 Points In Hirehalli (hhl) Yard (total 10 Nos., )". Sw Ii : Bengaluru - Sampige Road Sec : Construc
Estimated Cost :27325081 INR
06 Jun 2024