Himachal Pradesh Tenders | Himachal Tenders | HP Govt Tenders
Himachal Pradesh government tenders
- Transportation Roads and highways


LOCATION SUMMARY DEADLINE
Himachal Pradesh Annual Repair Maintenance Of On Rcd Road Km 21/00 To 29/00
Providing Patch Work At Rd 21/00 To 29/00

Estimated Cost :1131613
05 Jun 2024
Himachal Pradesh Improvement Of Narrow Reaches Of Rcd Road Km 0/00 To 92/695
Widening Of Road At Various Rd 56/00 To 61/930 And 66/405 To 69/205)

Estimated Cost :1891265
05 Jun 2024
Himachal Pradesh Construction Of Link Road Link Road From Harli To Gosangu( Gaon Pujarli To Tall Pool Km 0/00 To 2/00
F/c 5/7 Mtr Wide Road At Rd 0/435 To 2/00

Estimated Cost :9440159
05 Jun 2024
Himachal Pradesh Annual Repair Maintenance Of Road Rcd Road Km 0/00 To 92/695
Construction Of 10.00 Mtr Slab Culvert At Rd 82/750)

Estimated Cost :4662874
05 Jun 2024
Himachal Pradesh Construction Of Of Rohru Chirgaon Dodra Kawar Km 0/00 To 92/695
Providing And Laying Gsb, G-ii, G-iii Metalling And Tarring Work At Rd 31/00 To 32/00

Estimated Cost :4295050
05 Jun 2024
Himachal Pradesh Annual Repair Maintenance Of Link Road Village Jiskoon Km 0/00 To 8/00
Construction Of 10.00 Mtr Slab Culvert At Rd 3/605

Estimated Cost :4651849
05 Jun 2024
Himachal Pradesh Annual Repair Maintenance Of Khoptwari To Jarkot Road Km 0/00 To 1/00
Construction Of 6.00 Mtr Slab Culvert At Rd 0/990

Estimated Cost :3607477
05 Jun 2024
Himachal Pradesh Supply Of Ring Piston Set 1 62 -15t2, Ring Piston Set Lp-hp 3, Gasket Set, Valve Assy Complete 3 7t4, 15t, Valve Assembly, 3rd Stage Valve Assy, 31517725, Piston Assembly 3 Inches 15t2 T30, Piston Hp 1 5 By 8 Inches, Piston Assembly- Lp 5 5 Inches, Servic
Estimated Cost :354994 INR
10 Jun 2024
Himachal Pradesh Long Term Rectification Measures For Blackspot Identified By The Road Safety Consultant At Dhelu From Km 150 000 To 150-300 And At Tandu From Km 196-220 To 196-780 Of Nh-154 In The State Of Himachal Pradesh
Estimated Cost :8894362
20 Jun 2024
Himachal Pradesh Construction Of M/t Of Jhagtan-golchu-garli-kothu Road 0/0 Km To 5/645
F/c, Passing Place, R/wall, B/wall, Cross Drainage Hpc Road Side Drain, Gsb, M/t Parapets And Furniture) Five Year Maintenance Under Nabard Ridf-xxix

10 Jun 2024