Haryana Tenders | Haryana Govt Tenders | Haryana Tenders Online
Haryana government tenders
- Industry Plastic %26 Rubber


LOCATION SUMMARY DEADLINE
Haryana Quotations For Dera , Kala Amb , Group Of 2 No. Of Habitations Annual Maintenance Contract Works For Water Supply - Maintenance Of Roads Removal Of Existing Ipb By Manual Means And Disposal Of Dismantled Material With All Lead And Lift As Per Technical Sp
Estimated Cost :40983 INR
16 May 2024
Haryana Sunderpur Block: Lakhan Majra Panchayat: Sunderpur Dist.: Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Cc Road Cutting C C Road Cuting /all Size / In Vill. Sunderpur. Cum 8 2 Pipes / Pvc Pipe 6kgf P/f Pvc Pipe 150mm Supreme Complete In All Re
Estimated Cost :18800 INR
15 May 2024
Haryana Rubber Lining Of Vessels, Pipes And Fittings And Supply Of Newmsrl Pipes And Fittings For Pt Plant Dm Plant And Cw-chlorination Atntpc Faridabad
17 May 2024
Haryana Jeewra , Chowki No.1 , Asiaki Gorawas , Maliaki , Group Of 4 No. Of Habitations Annual Mtc.wo 1 Outsourcing Of Works/ Rectification Of W/s Leakages Job Work Repair / Disconnection In Sanitary Water Supply Connection To Avoid Mixing Of Contaminated Wat
Estimated Cost :13800 INR
20 May 2024
Haryana Annual Maintenance Contract Works For Water Supply - Hire Charges For Jcb With Bucket Capacity More Than 0.75 Cum With Fuel And Driver. #1 B Laying Of Ac / Pvc Pipes And Specials Jointing A.c./p.v.c. Pipes And Specials With Cast Iron Detachable Joints/spl
Estimated Cost :49284 INR
15 May 2024
Haryana Rojhuwas , Lala , Rohrai , Suma Khera , Group Of 4 No. Of Habitations Annual Mtc.works For Wat 1 Outsourcing Of Works/ Rectification Of W/s Leakages Job Work Repair / Disconnection In Sanitary Water Supply Connection To Avoid Mixing Of Contaminated Wa
Estimated Cost :11050 INR
20 May 2024
Haryana Annual Maintenance Contract Works For Water Supply - Hire Charges For Jcb With Bucket Capacity More Than 0.75 Cum With Fuel And Driver. #1 B Laying Of Ac / Pvc Pipes And Specials Jointing A.c./p.v.c. Pipes And Specials With Cast Iron Detachable Joints/spl
Estimated Cost :49882 INR
15 May 2024
Haryana Annual Maintenance Contract Works For Water Supply - Hire Charges For Jcb With Bucket Capacity More Than 0.75 Cum With Fuel And Driver. #1 B Laying Of Ac / Pvc Pipes And Specials Jointing A.c./p.v.c. Pipes And Specials With Cast Iron Detachable Joints/spl
Estimated Cost :48965 INR
15 May 2024
Haryana Ahmedpur Partal, Surkh Pur Tappa Kosli, Group Of 2 No. Of Habitations Annual Mtc.works For Water Sup 1 Outsourcing Of Works/ Rectification Of W/s Leakages Job Work Repair / Disconnection In Sanitary Water Supply Connection To Avoid Mixing Of Contamina
Estimated Cost :11250 INR
20 May 2024
Haryana Supply of 48 port edge switch Lot of 29 Nos, 24 port edge switch, Network Routers, 12-core Outside Plant Cable, 48F LIU, 1U, LC MM, 24F LIU, 1U, LC MM, 12F LIU, 1U, LC MM, LC-LC Style Multimode Duplex Patch Cord, LC-LC multimode Duplex, 10G SFP Plus MM Fiber Modules, Cat 6 UTP Cable box 300M, Cat-6
17 May 2024