Haryana Tenders | Haryana Govt Tenders | Haryana Tenders Online
Haryana government tenders
- Infrastructure Building


LOCATION SUMMARY DEADLINE
Haryana Chulkana Block: Samalkha Panchayat: Chulkana Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Temporary Toilet Providing And Fixing Of Vip Toilet / At Chulkana Mandir Programme 19 March 2024 To 21 March 2024.
Estimated Cost :12000 INR
26 Apr 2024
Haryana Chulkana Block: Samalkha Panchayat: Chulkana Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Temporary Toilet Providing And Fixing Of Vip Toilet / At Chulkana Mandir Programme 19 March 2024 To 21 March 2024.
Estimated Cost :12000 INR
26 Apr 2024
Haryana Construction Of 2 No. Covered Shed Of 9.10 X 6.10 Mtr Size Each For Storage At Ismd Building At New Shambhu & New Jagadhri In The Unit Of Cgm/dfcc/ambala.
Estimated Cost :2363216 INR
09 May 2024
Haryana Re-construction of complaint centre at panjiri plant under OP Sub-division CCC new colony, DHBVN.
The estimate is prepared to dismantle the existing dilapidated structure and re-construct the new complaint centre building at the same place.

Estimated Cost :500896
07 May 2024
Haryana Chulkana Block: Samalkha Panchayat: Chulkana Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Temporary Toilet Providing And Fixing Of Temporary Toilet / At Chulkana Mandir Programme 19 March 2024 To 21 March 2024.
Estimated Cost :14400 INR
26 Apr 2024
Haryana Chulkana Block: Samalkha Panchayat: Chulkana Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Temporary Toilet Providing And Fixing Of Vip Toilet / At Chulkana Mandir Programme 19 March 2024 To 21 March 2024.
Estimated Cost :12000 INR
26 Apr 2024
Haryana A/mtc Estimate Of The Office Of Engineer-in-chief Haryana Bay No. 13-20 Sector 4 Panchkula 1 Office Furniture/ Door Handle Tower Bolt 6 Ss / Phed Head Office Panchkula Reapir & Changing Of Various Door Tower Bolt Length 6 Inch Make Ss
2 Office

Estimated Cost :19150 INR
29 Apr 2024
Haryana Re-construction of Complaint Center building at sheetla mata mandir road by dismantling old dilapidated structure.
Estimated Cost :557146
07 May 2024
Haryana Welcome Maintenance To Omq Accommodation And Single Offrs Accommodation At Af Stn
Estimated Cost :2500000 INR
07 May 2024
Haryana Construction of Toilet facility and other allied work at Arjun Nagar Gurugram
Estimated Cost :317980
07 May 2024