Haryana Tenders | Haryana Govt Tenders | Haryana Tenders Online
Haryana government tenders
- Infrastructure and construction


Infrastructure Industry in India have been experiencing a rapid growth in its different sectors. The construction industry accounts for around one-tenth of the worlds gross domestic product, seven percent of employment, half of all resource usage and up to 40 percent of energy consumption. There is huge demand for Infrastructure and construction development projects all over India. A large number of construction industry tenders, public tender notices, procurement notices, bid invitation,Construction government tenders, international tenders, ICBs, tender notification and contracts afloat worldwide.

LOCATION SUMMARY DEADLINE
Haryana Construction Of Inlet At Rd 63500 Dhanaura Escape At Village Japti Chhapra For Protection Of Agriculutre Land After Flood 2023.
Estimated Cost :1250640 INR
21 May 2024
Haryana Resurfacing Of Roads, Hardstanding Of Zone A And B Under Ge(w)
Estimated Cost :15000000 INR
13 Jun 2024
Haryana Estimate For Removing Slush/x-bunds And Internal Clearance From Bhirtana Link Drain From Rd 0 To 13500.
Estimated Cost :164258 INR
21 May 2024
Haryana Supply Of Two Piece Glass Shutter Colour- Satin Blue, Drg. No.:- Rdso/sk-98062, Alt. [3] Specification:- Rdso/2007/cg-02 [rev.-1] With 2 Amendments. As Per Drg.no. Rdso/sk-98062, Alt. [3] Specn: Rdso/2007/cg-02 [rev.-1] With 2 Amendments.
Two Piece

27 May 2024
Haryana Providing Of Protection To Lalupura Complex Of River Yamuna By Repairing 07 Nos. Old Damaged Stone Studs And Construction Of 02 No. New Stone Stud And 3300 Ft Revetment After Flood-2023.
Estimated Cost :47291582 INR
21 May 2024
Haryana Estimate For Removing Slush/x-bunds And Internal Clearance From Hadwa Sub Drain From Rd 0 To 6321.
Estimated Cost :52636 INR
22 May 2024
Haryana Supply Of Installation Testing And Commissioning Of 10 Kwp Solar System,
Supply Installation Testing And Commissioning Of Following Item. (i) Smart On Grid Inverter Suitable For 10 Kwp Solar System And With Lan Data Monitoring Facility Along With Ca

27 May 2024
Haryana Supply Of Auxiliary Reservoir, 200 Liters Drawing No.:- Rdso / Sk-96081, Alt . (5) Specification: - 02-abr-2002 Amdt 4 [ Warranty Period: 36 Months After The Date Of Delivery ]
Auxiliary Reservoir, 200 Liters Drawing No.:- Rdso / Sk-96081, Alt . (5)

27 May 2024
Haryana Ted-469-b Pdc 2023-24
Release Of Tubewell Connection Under (op) Sub Division Dhbvn Nangal Chaudhary

Estimated Cost :143580559
04 Jun 2024
Haryana Handling, Transport Other Mining Services - Percentage Quote Based - Handling Transport Service Qty : 1
Estimated Cost :5006000 INR
06 Jun 2024