Haryana Tenders | Haryana Govt Tenders | Haryana Tenders Online
Haryana government tenders
- Infrastructure Building


LOCATION SUMMARY DEADLINE
Haryana Estimate For Costruction Of Additional Rooms For Waste Water Sample Testing At First Fl 1 Electrical Items/ Pvc Wire Black 02 / At Site Division Lab
2 Electrical Items/ Pvc Wire Black 1.5 / At Site Division Lab
3 Electrical Items/ Pvc Wire Bla

Estimated Cost :41135 INR
29 Apr 2024
Haryana Construction of JE Room, Record Room, Security guard room by dismantling old/damaged existing rooms and construction of open shed in the office of SDO Store.
Estimated Cost :1102972
07 May 2024
Haryana Construction Of 02 Additional Stories (1st And 2nd Floor) In Sports Hostel In Mdu .
Estimated Cost :20869000
14 May 2024
Haryana Estimate For Costruction Of Additional Rooms For Waste Water Sample Testing At First Fl 1 Electrical Items/ Fan Belt Fan Belt / Blank/at Site Division Lab
2 Electrical Items/ Fan Regulator Fan Regulator / 01 M /at Site Division Lab
3 Electrica

Estimated Cost :49129 INR
29 Apr 2024
Haryana Construction Of New Pwd Rest House At Hathin In District Palwal ( Providing Cctv Camera System).
Estimated Cost :738090 INR
06 May 2024
Haryana Ganaur Town Annual Mtc. Works For Water Supply, Na Finishing Works Removing Dry Or Oil Bound Distemper, Water Proofing Cement Paint And The Like By Scrapping, Sand papering And Preparing The Surface Smooth Including Necessary Repairs To Scratches Etc. Co
03 May 2024
Haryana A/mtc. W/s Govt. Bandr Rest House At Sonepat Town, Na Bokky Type Shello Tub Well Development Of Tube Well With Pump Of Suitable Rating To That Full Satisfaction And As Directed By The Engineer-in-charge.
02 May 2024
Haryana Construction of 2 Nos. of Storage Shed
Estimated Cost :759406
07 May 2024
Haryana Provision Of Stn Swimming Pool For Watermanship Trg At Mil Station
Estimated Cost :105000000 INR
29 May 2024
Haryana Re-construction of complaint centre at panjiri plant under OP Sub-division CCC new colony, DHBVN.
The estimate is prepared to dismantle the existing dilapidated structure and re-construct the new complaint centre building at the same place.

Estimated Cost :500896
07 May 2024